Forum quick links
Erosion and Sedimentation Measures during demolition
NC-v4 SSp1:Construction activity pollution preventionposted by Anaïs P on
During demolition works, should the Erosion and Sedimentation measures be implemented? The Reference Guide only refers to construction works...
area of reference
NC-v4 LTc7:Reduced parking footprintposted by Mark Daub on
what is the area of reference to calculate the number of parking spaces? gross floor area or usable floor area?
Facades Extending Sidewalks
Pilot-Credits PC14:Walkable Streetsposted by ray keane on
For the following requirement: - If a facade extends along a sidewalk, no more than 40% of its length or 50 feet, whichever is less, is blank (without doors or windows). Is the requirement met if
Light in open 3 story mezzanines
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Elliot Young on
We just received our design credit responses and used method 2 - Prescriptive. We have a 3 story cafeteria space within a 30 story office building.
CO2 in small space / private offices
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by CT G on
Dear all, Once I saw a LEED Interpretation stating that small spaces, or private offices, could be exempt of installing CO2 sensors to comply with this credit, for CI only, not to NC. I can't find
School as a Teaching Tool and Green Education
NC-2009 IDc1:Innovation in Designposted by emily reese moody on
I am posting my question here, since it appears the v2.2 ID forum is closed for new comments. I have a v2.2 LEED-NC Campus project working on the final construction submission.
FTE Staff numbers for a Convention Centre
NC-2009 PIf3:Occupant and Usage Dataposted by Meghan Ward on
Hello, We are working on a convention centre project in Africa, but we are battling to obtain a number for FTE staff numbers.
Historic Building Cold Dark Shell
CS-2009 EAp2:Minimum Energy Performanceposted by Tommy Linstroth on
We're working on a historic renovation, total gut, but will be left as a cold dark shell - no MEP at all, it will all be in the tenant scope of work.
Single supply system
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Does anyone know a definition for "single supply system". I've looked it up in ASHRAE 62.1 and ASHRAE's Manual and I wasn't able to find it.
Interior Renovation
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Jeremy Kuhre on
I'm seeking clarification on how this credit applies to an interior renovation where the existing tenant maintains 100% of its existing furniture.