Forum quick links
Recert vs. new Cert
posted by Jessica Hawley on
Reading through this forum I still don't think I see a clear consensus on recert vs. new cert. I have a client who was originally certified in 2011 EBOM and they are up for recertification.
Hydrogen Production
NC-2009 EAc2:On-Site Renewable Energyposted by Kristopher Lashley on
Hi, We are looking to install an on-site hydrogen production station that will produce hydrogen that is then sent to hydrogen charging stations around the project to refuel and run a fleet of hdrog
Walking distance from the barracks
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jose Dehitta on
Our project is a cafeteria which is inside the military base. All the soldiers walks from their barracks to eat or pick up food at the cafeteria. Can we use Option #2 to get 6 points?
How to count Individual Worksations
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by SAMY Chamy on
Dears:- we have open office with 20 Desk.in every desk three occupants are working.That three occupants do the same operations in 15 desks in remaining desks they do different activities How can
LEED V4 - TENANT SPACE ENERGY MODELING
CI-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hi, Regarding the Energy Performance Calgulator that should be used instead of Table 1.4, my questions are: 1.
Energy modeling for LEED project (v3) requirement or not
posted by al-emran hossain on
We are going to start LEED project (Gold, points 66) in RMG factory at Bangladesh , if we will not consider in energy modeling for v3, that will accept or not , and required then which energy model
Concessions Spaces
posted by Deborah Ebersole on
We are looking to certify nineteen concession spaces in an existing airport. The spaces all share one mechanical system and one water source and do not appear to be sub-metered.
Use of renewable energy in calculation
ND-v4 GIBc2:Optimize building energy performanceposted by Martine Desbois on
I just would like to confirm that we can use the renewable energy used in our buildings as part of the calculation for energy saving as is done in LEED NC. Is this correct?
Whole building Energy and Water Usage Data
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Terry Squyres on
I was wondering if somebody could help walk me through this aspect of PIf1. My project is a University building in which we will have limited monitoring.
Recycled Content Criteria?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Brad McAllister on
Option 2 states: Recycled content. Recycled content is the sum of postconsumer recycled content plus one-half the preconsumer recycled content, based on cost.