Forum quick links
Adhesive credits
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Patricia Taylor on
As a Flooring contractor, I get many customers that request we submit LEED information many different ways. A couple have asked that I break out the qty and total material cost for adhesives.
tenant submetering?
CI-2009 EAc3:Measurement and Verificationposted by Courtney Royal on
We have a LEED-CI project occupying one floor of a building, but the project space will be occupied by multiple tenants.
Dimension of entryway systems
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by LEED Pro Consultant on
Hi, We are trying to apply this credit in a small office building, so we want to know if the dimension of entryway systems can be modified due to three meters is a very large distance in a building
Cost Savings from an Owner PPA
NC-2009 EAc1:Optimize Energy Performanceposted by David Hart on
If an owner constructs a remote net-metered PV system as part of a power purchase agreement (PPA), can the PPA cost savings be used to increase the efficiency (cost) savings vs.
NSF 140 Gold vs Platinum
CI-2009 IDc1:Innovation in Designposted by Kristine Byers on
We are considering an ID Credit for having all of the carpet on the project NSF 140 Certified. My questions: 1. Is this ID Credit still available for CI2009? 2.
Definition of one building
NC-2009 PIf2:Project Summary Detailsposted by Cindy Quinn on
What is the definition of one building? Specifically, how much connection between two building portions must there be in order for LEED to consider it one building?
Exhaust for Hazardous Material storage
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Hi guys! I have a two part question on the Hazardous Materials Storage ventilation requirements according to ASHRAE 170. 1.
Time to utilize water volume - International project
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Maria Isabel Conde on
Hello, In our project outside the US and in the rainy tropics our site pre-development is >50% impervious (only 10% site is natural green) therefore we need to go for 25% reduction in both volu
Cyclist provision for hotels
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I am currently working on the LEED assessment of a hotel.
Option 2 for LEED CI EAc1.3
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Alan Li on
I'm working on a project that pursues the CI EAc1.3 credit by following Option 2 using ASHRAE 90.1-2007 Section 11.