Forum discussion

EBOM-v4 EQc2:Enhanced indoor air quality strategies

Dimension of entryway systems

Hi, We are trying to apply this credit in a small office building, so we want to know if the dimension of entryway systems can be modified due to three meters is a very large distance in a building like this. Thanks in advance,

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 08/12/2014 - 17:04

No. I have taken this issue to the TAG before and the response was that this credit was not applicable to the project type.

Thu, 03/24/2016 - 21:12

Page 439 of the v4 Reference Guide says that exceptions to the 10-foot length requirement are allowed, provided you can sufficiently document that the shorter entryway system is just as effective as a full length system. I'm not exactly sure what that documentation would look like, but it does give teams the opportunity to submit with shorter systems.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.