Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Raised flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Florinda Garcia   on 

does the raised floor must meet the floorscore requirements?

2
Wed Mar 30, 2016, 4:56 pm

In-Unit Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Khaled Fouda  on 

I've received a comment from the LEED reviewer after they denied my approach in calculating the LPD for the proposed building (dwelling units).

3
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Wed Mar 30, 2016, 3:21 pm

Using historic data

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Omar Delgado  on 

What are the requirements to comply with this prerequisite if using historic data? How much (percentage) lower than the historic average must my current EUI be?

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Wed Mar 30, 2016, 3:04 pm
7
Default Avatar
Associate
Hurley Palmer Flatt
LEEDuser Basic Member
5 thumbs up
Wed Mar 30, 2016, 2:59 pm

Conflict with energy efficiency in extreme climate

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Ranya Metwalli Shields  on 

We are optimizing a 4 storey residential building for certification under LEED EBOM (it is currently under construction) . Most residential units will have to allow smoking .

7
Tue Mar 29, 2016, 10:01 pm

Waste Stream Audit - metals and wet waste

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Pablo Fortunato Suarez  on 

The project is going for re-certification and was previously awarded this credit. In the new online form, there are prescribed categories.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Mar 29, 2016, 6:25 pm

Metered Faucet: Max GPC or Flow Rate x Duration?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Christian Kaltreider  on 

Hello, My project will use metering handwash faucets at the lavatories. The flow rate is 0.5 gpm.

2
Tue Mar 29, 2016, 5:40 pm
2
Tue Mar 29, 2016, 3:29 pm

submetering general requirements and strategy for metering HVAC

CI-2009 EAc3:Measurement and Verification
posted by  Rob Pinkston  on 

Hello, We are working on a low-rise office building and pursuing LEED CS v2009 for the base-building and LEED CI v2009 for at least one of the tenant spaces.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Tue Mar 29, 2016, 3:08 pm

Fiberglass Fiberboard Adhered to NAUF MDF

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Andrée Iffrig  on 

One of our clients is planning to use a tackable fabric tile composed of NAUF MDF, fiberboard (fiberglass with a urea formaldehdye resin), UF-free adhesive and fabric. The tile is like a sandwich.

2
Mon Mar 28, 2016, 6:36 pm