Forum quick links
CxA Same for all Paths?
NC-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Does the CxA need to be the same firm/person for Path 2 and Option 2, as it does for Path 1?
Permanently Installed Furniture?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Michael Smithing on
Option 1 requires that products be permanently installed. Do furniture products installed in a LEED CI project qualify for inclusion in the EPD list?
Value of Enhanced Commissioning
NC-v4 EAc1:Enhanced commissioningposted by Hannah Fleck on
I have a client who is asking what the value of pursuing enhanced commissioning versus fundamental.
LEED compliant Drywall
posted by Phil Vanderloo on
I'm trying to search out some LEED compliant drywall for the material and resources credit, (homes v4). Needs to be either 25% post consumer recycled product or 50% pre consumer recycled product.
Access to LEED Pilot Credits
posted by Sara Goenner Curlee on
Speculative Retail - No Meters Provided.
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Im working on a mixed use development that consists of office space and retail units.
Area of all Parking - PI form 2
NC-2009 PIf2:Project Summary Detailsposted by sara todavchick on
In PI form 2, I am asked to provide the sq ft of the "area of all parking wtihin the LEED project boundary".
Reference for the Total Daily Uses numbers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Neshat Sakeena on
Hello, I was just wondering if anyone knows the reference or basis of the numbers used in Table 2. Default Fixture Uses, by Occupancy Type in the LEED manual?
Feature 65 - Activity Incentive Program
posted by Dave Hubka on
The WELL Assessor on our project has stated that "Part 1f is slightly different in that it is a demonstration of employee participation, and is looking backwards".