VOC - exempt compounds larger than 1%
Retail-NC-v4 EQc2:Low emitting materialsposted by Ian McCall on
Hello, The LEED guidebook, states "If the applicable regulation requires subtraction of exempt compounds, any content of intentionally added exempt compounds larger than 1% weight by mass (total e
EBOM IEQp1-A1 Statement "Would need over 100% OA Intake"
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by James Doyle on
Our EBOM 2009 project credit data has to be completed by 8-5 and I am getting a message "Would need over 100% OA Intake" at the end of the IEQp1-A1 VAV data input form.
CxA Allowed to be Hired by GC?
CI-2009 EAc2:Enhanced Commissioningposted by LUCY WILLIAMS on
Hi, Does the GBCI accept the Cx Agent for the Enhanced Commissioning credit to now be hired by the Contractor in a design-build scenario? In reading Interpretation #10244, it seems this is now all
French VOC emission labeling
NC-v4 EQc2:Low emitting materialsposted by FABIO VIERO on
Hi all Could you confirm that for General Emission Evalutation, French VOC emission labeling is accepted even if in the document http://www.usgbc.org/sites/default/files/Low%20Emitting%20Third%20Pa
intumescent paints
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Eszter Gulacsy on
Has anyone had any experience about VOC limits for intumescent paints for EQc4.2 (i.e. paints for fire-proofing steel)?
Baseline outdoor airflow with EN 15251 and DCV
CS-v4 EAp2:Minimum energy performanceposted by Sandra Holmström on
Hi, We have a LEED v4 project (office building) were the project team want to use the CEN option for IEQp1 (using EN 15251 instead of ASHRAE 62.1). Also, for the energy modeling, the Proposed bui
Scrap as regional material
NC-2009 MRc5:Regional Materialsposted by FABIO VIERO on
Hi everyone. Could a scrap of a production process be claimed as regional material, assuming that it is generated and harvested in the same plant (which is, of course less the 160 km from project s
EAp1 Minimum Energy Performance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by sriram tetali on
Hi, Please help us in solving the Errors in the Minimum Energy Performance Calculator. Project Registered under => LEED NC BD+C -v3 (2009) • Macros are not getting enabled • Shading & Fenes
Performance Period for Recertification
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Frances Yang on
For EBOM recertification purposes, my project is achieving SSc5 for the first time, through the off-site option. What I know: - For a first certification, we would get a contract to maintain an off
Wood Derived Fuel - Used in Home Fireplace
NC-2009 MRc2:Construction Waste Managementposted by Mario S. on
We are working on a project that generates a lot of scrap wood from formwork.