Forum quick links
smoking lounge
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Pablo Fortunato Suarez on
The project has a designated indoor smoking lounge located on the ground floor that has a separate entrance - more than 25 feet away from building entrances.
LEED AP - Homes or BD&C?
Homes-v4 INc2:LEED AP for Homesposted by David Ekstrom on
Basic credit languages says "LEED AP with a specialty appropriate to the project," which would logically be LEED AP-Homes.
Green Cleaning
CI-2009 IDc1:Innovation in Designposted by H. Group on
Credit 1.1 - How can i obtain point for Green Cleaning? What do i need to provide? thank you
phases of project & VOCs
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Debra a. Lombard on
we are a GC working on a project that is the renovation of a historic bldg and that renovation started a very long time ago '(about 3 yrs ago) and about a year before the project was registered for
ASHRAE 90.1-2007 article G3.1.1 exception (a)
NC-2009 EAc1:Optimize Energy Performanceposted by Ann-Judith Belanger on
Hi everyone, I have a question regarding the reference's HVAC heating energy source for my projet.
Baseline model for storage facility
Warehouses-NC-v4 EAc2:Optimize energy performanceposted by Jeremiah Crossett on
Hi, I am working on a 5 story self storage building in Shoreline WA as the modeler.
Leed 2009 NC-District cooling path one
NC-2009 EAc1:Optimize Energy Performanceposted by Mark JIN on
Dear Friends, I have a project located at Dubai where a localized existing district cooling plant will be providing chilled water.
Green Bike Station
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Saurabh Shrestha on
Is there any advantage if the project locates a Green Bike Station (from where bikes could be rented) within the vicinity of the project (even if it is not within 200 yards)?
Finished surface of structural wall?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Erin Holdenried on
Hi. Does one include the finished surface (such as tile, or painted GWB) applied to or furred out from a structural wall in this credit? Thanks!