Zero Lot Line Property
NC-v4 SSc6:Light pollution reductionposted by Edgar Arevalo on
The building that is going for LEED certification is on a zero lot line property.
California testing standard for VOC
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Sherman Aronson on
For IEQ 4.3, VOC in flooring, does anyone have a copy of the California Standard Practice for the Testing of Volatile Organic Emissions from Various Sources using small-scale environmental chambers
VOC instead of CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Jens Apel on
the designer suggests to use VOC sensors instead of CO2 sensors in a number of lunch rooms and the smoking room.
Rainwater used for irrigation
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Agnieszka Rylska on
Does reusing rainwater for irrigation complies with this credit's requirements?
WDF - Power generation other than electricity?
NC-2009 MRc2:Construction Waste Managementposted by Guido Petinelli on
According to LEED interpretation #10061- Wood Derived Fuel (WDF) meets the intent of credit MRc2. We would like clarification on the definition of “fuel” for the purposes of LEED.
Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Ed Kokosa on
I thought that I did this yesterday, but lucky for you it didn't post so I'll keep it much shorter on this try. Is everyone just making up numbers for this input? Unless you have a downward blowing
One Screen for two purposes
NC-2009 IDc1:Innovation in Designposted by Omar Elrawy on
Dear all, I have two questions, the first: Can we achieve the credit by one screen that shows both; Building's LEED related data, and the owner company advertisement, that will keep looping all day
Discounted Permits as Preferred Parking?
NC-v4 LTc7:Reduced parking footprintposted by Nathan Gauthier on
Have people tried using discounted parking as preferred parking for this credit?
Hiring CxA for Construction other than one hired during Design
NC-v4 EAc1:Enhanced commissioningposted by mohammad Hassan on
Can a different CxA for a project Construction Phase be hired other than the one hired during Design Phase ?
v4 SSc6 - Hardscape requires a minimum of 0.2 fc to be counted
posted by Bill Swanson on
Been awhile since this thread has been used. This has come up on a project and we lost on appeal so I'm sharing this information with everyone. Any area being claimed in the wattage baseline calc