Roof Water Feature

NC-v4 SSc5:Heat island reduction
posted by  Omer Moltay  on 

Dear All, My project is a museum building. The building roof is thick with water. So, project building roof have pool and observation terrace. Should it be counted as a reflective?

3
Default Avatar
Senior Architect
Dubai
LEEDuser Basic Member
0 thumbs up
Sat Aug 26, 2017, 12:20 pm

LEED Review - Simulation Worst-Case Not Accepted

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  GBD Architects  on 

I submitted a simulation output for our core and shell building.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Aug 25, 2017, 2:49 pm

Is this plant qualified as a DES?

NC-v4 EAp2:Minimum energy performance
posted by  Aru Sau  on 

1. We registered the project as Campus consisting 3 Buildings. Central Plant Building and the future building is not included in the LEED boundary. 2.

3
LEEDuser Basic Member
4 thumbs up
Fri Aug 25, 2017, 2:43 pm

EPD expiration date

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Harry Flamm  on 

Since EPDs have an expiration date, and though we may have specified a product while it is valid, it may get constructed in the building after it's expiration date.

2
Senior Sustainability Consultant
Stantec Architecture
LEEDuser Premium Member
20 thumbs up
Wed Aug 23, 2017, 9:36 pm

FEV/LEV Signs

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Karl Heitman  on 

Does the sign have to be a post type? Could it be letters painted on the ground?

2
Wed Aug 23, 2017, 6:50 pm

LEED CI v3 - Ofice - Energy Model. Please Advise

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  SSN Energy Model  on 

Hi, I am doing Energy Model for LEED CI Project under V3 2009 Rating System. The project is G+M+3 Floors. Our tenant spaces are located in 1st Floor.

6
Wed Aug 23, 2017, 6:08 pm

Process Water Uses

NC-v4 WEp2:Indoor water use reduction
posted by  Claire DeCamp  on 

Our projects frequently have process water uses in labs or other equipment that is not listed here, as well as laboratory faucets, or hose wash down areas. How are these to be handled in v4?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Aug 23, 2017, 3:14 pm

Garage ventilation - Baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, There are some more details about this issue, for which I'd appreciate very much some clarifications. Regarding the modeling approach for garage ventilation in the Baseline, it should fo

6
Wed Aug 23, 2017, 12:29 pm

EPD Credits - Exemplary Performance

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Chris Brown  on 

All three of the EPD credits have two options each that can be pursued individually for one point or together for a total of two points for each EPD credit.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Aug 22, 2017, 5:52 pm

Change the Location/Alter Something After Standard Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ainz Oli  on 

Can we still alter the location or renovate something after the standard review (for example: relocation of bike racks)?

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Aug 22, 2017, 7:56 am