NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
R-Value for wall assembly
NC-2009 EAp2:Minimum Energy Performanceposted by Sunil S on
I am working on a residential building, the exterior wall assembly as R-19 fill cavity between studs for an 3.5" depth (wood studs 2x4 16" OC) but in the ASHRAE table A3.4, there is no value menti
Budget Method
NC-v4 EQc2:Low emitting materialsposted by LUCY WILLIAMS on
We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.
Conflict of interest?
NC-v4 EQc4:Indoor air quality assessmentposted by emily reese moody on
Are there any conflict of interest concerns if a contractor hires the air testing company versus the owner or A/E?
Steel Studs vs. Track
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Johanna Scogin on
Does the steel stud count as different material than the track?
New LEED building within existing LEED project site boundary
posted by Krissy Buck Flickinger on
I have a building registered under LEED NCv2009, that is being built entirely within the LEED boundary of a certified LEED NCv2.2 Gold project. Same owner.
Railway station
ND-v2009 NPDc7:Transit facilitiesposted by Noriko Nagazumi on
Hi, Our project includes railway station within the LEED ND v2009 project boundary, but no bus stop.
Mixed Mode Ventilation for Apartment Kitchens
NC-2009 IEQp1:Minimum IAQ Performanceposted by Neil Sen on
We are designing apartments with mixed mode ventilation--the areas within 25 feet of a window will be naturally ventilated and the rest of the dwelling units will be mechanically ventilated.
Existing Chillers in Basement (not in project boundary)
CI-v4 EAp3:Fundamental refrigerant managementposted by Heather Zeto on
Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building).
LEED HC (major renovation) or CI (v4)?
posted by Heather Zeto on
I have a project that is undergoing discussion regarding which rating system to use. For all practical purposes, it is an interior fit-out of 4 floors of a hospital tower for a new unit.