NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Antonio Macedo Filho  on 

I would like to know if there is a maximum obstruction height of views for option 1.

1
Thu Aug 17, 2017, 1:29 pm

R-Value for wall assembly

NC-2009 EAp2:Minimum Energy Performance
posted by  Sunil S  on 

I am working on a residential building, the exterior wall assembly as R-19 fill cavity between studs for an 3.5" depth (wood studs 2x4 16" OC) but in the ASHRAE table A3.4, there is no value menti

1
Thu Aug 17, 2017, 3:45 pm

Budget Method

NC-v4 EQc2:Low emitting materials
posted by  LUCY WILLIAMS  on 

We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.

1
Mon Aug 21, 2017, 1:25 pm

Conflict of interest?

NC-v4 EQc4:Indoor air quality assessment
posted by  emily reese moody  on 

Are there any conflict of interest concerns if a contractor hires the air testing company versus the owner or A/E?

1
Thu Aug 17, 2017, 11:22 pm

Steel Studs vs. Track

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Johanna Scogin  on 

Does the steel stud count as different material than the track?

1
Sat Aug 26, 2017, 1:31 pm

New LEED building within existing LEED project site boundary

LEED Guidance for Campuses and Multiple Buildings
posted by  Krissy Buck Flickinger  on 

I have a building registered under LEED NCv2009, that is being built entirely within the LEED boundary of a certified LEED NCv2.2 Gold project. Same owner.

1
Thu Aug 17, 2017, 10:26 pm

Railway station

ND-v2009 NPDc7:Transit facilities
posted by  Noriko Nagazumi  on 

Hi, Our project includes railway station within the LEED ND v2009 project boundary, but no bus stop.

1
Fri Aug 18, 2017, 3:30 pm

Mixed Mode Ventilation for Apartment Kitchens

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Neil Sen  on 

We are designing apartments with mixed mode ventilation--the areas within 25 feet of a window will be naturally ventilated and the rest of the dwelling units will be mechanically ventilated.

1
Sun Aug 27, 2017, 10:56 pm

Existing Chillers in Basement (not in project boundary)

CI-v4 EAp3:Fundamental refrigerant management
posted by  Heather Zeto  on 

Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building).

1
Mon Aug 28, 2017, 10:14 pm

LEED HC (major renovation) or CI (v4)?

LEED Rating System Selection
posted by  Heather Zeto  on 

I have a project that is undergoing discussion regarding which rating system to use. For all practical purposes, it is an interior fit-out of 4 floors of a hospital tower for a new unit.

1
Sat Aug 26, 2017, 7:32 pm