Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Doubts in Green power & REC

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the

1
Fri May 26, 2017, 3:24 pm

working in certified campus

LEED Guidance for Campuses and Multiple Buildings
posted by  sara m  on 

if I am working on a new project that will be located in a gold certified campus; does it mean the new project will be gold certified?

1
Fri May 26, 2017, 6:30 pm

EA Credit 2

NC-2009 EAc2:On-Site Renewable Energy
posted by  Cristina Parenti  on 

Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..

1
Fri May 26, 2017, 2:53 pm

Water Use Reduction

Schools-2009 WEc3:Water Use Reduction
posted by  Karly Michalowski  on 

I have a Daycare center that's pursuing LEED-NC v2009. There are a couple of "changing room stations" that have sinks. Would these be classified as kitchen sinks or lavatory sinks? thanks!

1
Sun Aug 27, 2017, 12:14 am

Roof for School

Schools-NC-v4 EQc2:Low emitting materials
posted by  Josh Inge  on 

If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?

0

Joint Compound

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Michele Helou  on 

Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?

0

what type of document required uploading to LEED ARC

Discuss the LEED Dynamic Plaque and Arc
posted by  Subrota Roy  on 

Hi, For existing building LEED certification which type of data/document required upload to LEED ARC & what will be the timeline & process ? If any example it will be very good for me.

0

VRF System Computation

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Katherine Mariano  on 

Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!

1
Tue Jun 6, 2017, 3:25 pm

EPDM tile and Wood Porch

Schools-NC-v4 EQc2:Low emitting materials
posted by  Emmanuel Pauwels  on 

We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a

1
Wed Jun 21, 2017, 2:53 pm

Treatment of Outdoor Air for Incomplete Spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Chappell  on 

I recently received LEED review comments regarding the treatment of incomplete space in an energy model for a proposed new construction building.

1
Tue May 30, 2017, 8:24 pm