Forum quick links
Doubts in Green power & REC
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the
working in certified campus
posted by sara m on
if I am working on a new project that will be located in a gold certified campus; does it mean the new project will be gold certified?
EA Credit 2
NC-2009 EAc2:On-Site Renewable Energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Water Use Reduction
Schools-2009 WEc3:Water Use Reductionposted by Karly Michalowski on
I have a Daycare center that's pursuing LEED-NC v2009. There are a couple of "changing room stations" that have sinks. Would these be classified as kitchen sinks or lavatory sinks? thanks!
Roof for School
Schools-NC-v4 EQc2:Low emitting materialsposted by Josh Inge on
If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?
Joint Compound
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?
what type of document required uploading to LEED ARC
posted by Subrota Roy on
Hi, For existing building LEED certification which type of data/document required upload to LEED ARC & what will be the timeline & process ? If any example it will be very good for me.
VRF System Computation
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Katherine Mariano on
Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!
EPDM tile and Wood Porch
Schools-NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a
Treatment of Outdoor Air for Incomplete Spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Joseph Chappell on
I recently received LEED review comments regarding the treatment of incomplete space in an energy model for a proposed new construction building.