Informal Bus Services

NC-v4 LTc5:Access to quality transit
posted by  Ben Pratt  on 

I am working on a project in Beirut where there is a lack of municipal public transit options - thus making it a challenge to target this credit.

1
Tue Mar 21, 2017, 11:43 pm

Individual user adjustments: NON-permanent interior obstruction?

NC-v4 EQc8:Quality views
posted by  Greg Romanczyk  on 

We have an open office with 42” H workstations and are pursuing the v4 Quality Views credit.

1
Mon Aug 28, 2017, 11:42 am

University Campus with Solar, not in Project LPB

CI-v4 EAc4:Renewable energy production
posted by  Sara Zoumbaris  on 

Our project is the renovation of an existing university building.

1
Mon Aug 28, 2017, 2:11 pm

electrical and plumbing in pre construction meeting

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  filomena nigro  on 

if I need to do a pre construction meeting kick off, what is the involvement of electrical and plumbing at the stage of excavation?

1
Sat Aug 26, 2017, 3:56 pm

Energy Effiicency Measures

CI-v4 EAc2:Optimize energy performance
posted by  Kalyan Nishtala  on 

Under option one for compliance (energy simulation), which measures can credit be taken for?

1
Fri Mar 17, 2017, 2:01 pm

SS C6.1: Bio Retention Dead Storage Offset

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Robert Howell  on 

Past conversations have said that the volume stored in the soil mix and the dead storage above the soil mix (below the overflow) in bio-retention basins can be used to offset the runoff volume incr

1
Fri Mar 17, 2017, 4:30 pm

green roofs

NC-v4 WEp1:Outdoor water use reduction
posted by  Geoffrey Katz  on 

Hello all, Under Option 1 are vegetated (green) roofs considered as part of the landscape that requires (or does not require) a permanent irrigation system?

1
Wed Mar 29, 2017, 3:11 pm

roller shades/blinds

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Pablo Fortunato Suarez  on 

My queries: 1) Are roller shades/blinds part of the criteria for this or any related MR credits?

1
Wed Mar 29, 2017, 3:28 pm

solid surface for countertops

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Pablo Fortunato Suarez  on 

The scope of materials covers - thermal and acoustic insulation, flooring materials and finishes, ceiling materials and finishes and wall materials and finishes.

1
Tue Jul 25, 2017, 11:44 pm

ESVE Requirement

Pilot-Credits LTpc70:Green vehicles
posted by  Joshua Chia  on 

Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or time-of-use pricing means that we must participate in either on

0