NC-v4 LTc5:Access to quality transitposted by Ben Pratt on
I am working on a project in Beirut where there is a lack of municipal public transit options - thus making it a challenge to target this credit.
Individual user adjustments: NON-permanent interior obstruction?
NC-v4 EQc8:Quality viewsposted by Greg Romanczyk on
We have an open office with 42” H workstations and are pursuing the v4 Quality Views credit.
University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.
electrical and plumbing in pre construction meeting
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by filomena nigro on
if I need to do a pre construction meeting kick off, what is the involvement of electrical and plumbing at the stage of excavation?
Energy Effiicency Measures
CI-v4 EAc2:Optimize energy performanceposted by Kalyan Nishtala on
Under option one for compliance (energy simulation), which measures can credit be taken for?
SS C6.1: Bio Retention Dead Storage Offset
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Robert Howell on
Past conversations have said that the volume stored in the soil mix and the dead storage above the soil mix (below the overflow) in bio-retention basins can be used to offset the runoff volume incr
green roofs
NC-v4 WEp1:Outdoor water use reductionposted by Geoffrey Katz on
Hello all, Under Option 1 are vegetated (green) roofs considered as part of the landscape that requires (or does not require) a permanent irrigation system?
roller shades/blinds
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Pablo Fortunato Suarez on
My queries: 1) Are roller shades/blinds part of the criteria for this or any related MR credits?
solid surface for countertops
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Pablo Fortunato Suarez on
The scope of materials covers - thermal and acoustic insulation, flooring materials and finishes, ceiling materials and finishes and wall materials and finishes.
ESVE Requirement
Pilot-Credits LTpc70:Green vehiclesposted by Joshua Chia on
Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or time-of-use pricing means that we must participate in either on