Forum quick links
SSc4 Option 5 Delivery Service
Retail-NC-v2009 SSc4:Alternative transportationposted by Brian Coffman on
Regarding SSc4 Option 5 Delivery Service. The client/owner is a department store chain which has a main website that offers shipping for online purchases.
Existing Site Conditions altered w/in project boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Jim Pugh on
All, We submitted a dormitory project for a university in which there was a very substantial amount of existing parking between our new building and another part of our project (a new, relatively
Material & Recycled Calculator - v2009
NC-2009 MRc5:Regional Materialsposted by Denise Domino on
Can a reviewer tell me how they would like to see this spreadsheet set up? I started with entering as I got the information and then quickly realized when I needed to add another Vendor to the pro
Notes under table in LEED credit form
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Patryk Marciniszyn on
Hi all, under the table in LEED credit form there is a note: Average refrigerant impact per kW must be less than or equal to 13 for 2 points. Does it mean that I won't get 2 points for having av
Medical Equipment Specification
Healthcare-v4 WEp2:Indoor water use reductionposted by Gabriela Crespo on
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req.
Elementary School
NC-v4 EAp2:Minimum energy performanceposted by K Nakamura on
Is there any special considerations for a project registered (v2.2) and designed 10 years ago is now being constructed. V2.2 and v2009 have expired so we need to register it for v4.
Building facade facing circulation network not more than 1ft
ND-v4 NPDc1:Walkable streetsposted by Kristina Pobre on
I'm a bit confused with why LEED ND is putting a point on this specific criteria.
Zero lot line
EBOM-v4 SSc5:Site managementposted by Lawrence Lile on
Can a zero lot line building achieve this credit?
Does FloorScore apply to subfloor surfaces?
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Edgar Arevalo on
I have a project where I received a submittal for a subflooring hard surface material.
Portable Basketball Floor
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Summer Minchew on
Would a portable basketball floor be considered not "permanently installed" and therefore not subject to credit requirements?