Forum quick links
LEED v4 Materials specification
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Judhajit Chakraborty on
What are the roles and responsibilities (architect, contractor) for specifying new materials credits like this one?
Phases of construction
Schools-2009 MPR2:Must be a complete, permanent building or spaceposted by Cindy Quinn on
I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification.
Documentation required
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.
Compost as an additional recyclable
NC-v4 MRp1:Storage and collection of recyclablesposted by Sara Zoumbaris on
Our project has company-wide recycling programs set up which collect batteries, mercury containing lamps AND electronic waste, however the collection boxes are not out in the open as the collection
pilot closure
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Batya Metalitz on
Based on MR TAG recommendation, this credit is scheduled to close on 3/15/2017. Any projects registered before that date may continue to use the credit on their registered project.
pilot closure
Pilot-Credits MRpc76:Material ingredient reportingposted by Batya Metalitz on
Based on MR TAG recommendation, this credit is scheduled to close on 3/15/2017. Any projects registered before that date may continue to use the credit on their registered project.
moving to innovation catalog on 3/15/2017
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Batya Metalitz on
Based on MR TAG recommendation, this credit is scheduled to be moved to the LEED innovation catalog on 3/15/2017.
moving to innovation catalog on 3/15/2017
Pilot-Credits MRpc61:Material disclosure and assessmentposted by Batya Metalitz on
Based on MR TAG recommendation, this credit is scheduled to be moved to the LEED innovation catalog on 3/15/2017.
moving to innovation catalog on 3/15/2017
Pilot-Credits MRpc77:Material ingredient optimizationposted by Batya Metalitz on
Based on MR TAG recommendation, this credit is scheduled to be moved to the LEED innovation catalog on 3/15/2017.
moving to innovation catalog on 3/15/2017
Pilot-Credits MRpc79:Material ingredients product manufacturer supply chain optimizationposted by Batya Metalitz on
Based on MR TAG recommendation, this credit is scheduled to be moved to the LEED innovation catalog on 3/15/2017.