Forum quick links
Major renovation with re-insulation of external walls and roofs
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Qian Tang on
Dear All, I´m working on a major renovation project. All the external concrete walls, roofs and pillar should be maintained but the insulation layer above the concrete will be changed with the bett
REACH
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jonathan Weiss on
I see that REACH is listed as an international compliance path, what about a US based project that is using some REACH compliant materials - some specialized application flooring, for example, is m
No mention of Private offices
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Edgar Arevalo on
Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.
SS - EM
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.
Definition of fried
posted by Dionisio Franca on
Hi! Under no 38 - Fruits and Vegetables we have "At least 50% of available options are fruits and/or non-fried vegetables." Does fry here includes stir-fry?
documentation
NC-v4 MPR1:Must be in a permanent location on existing landposted by sepideh khodadadi on
i am working on a big project and have absolutely no experience in LEED .
Which version of LEED forms to use.
NC-2009 IEQp1:Minimum IAQ Performanceposted by VEL MUTHU on
We are working on a project which was registered under V3 on 2015 and still running. My doubt is the the online form is updated from version to version.
LEEDv4 compliant operable partitions?
NC-v4 EQc2:Low emitting materialsposted by Joanna Switzer on
Has anyone had luck in locating CPHv1.1-2010 tested (or alternately Green Guard Gold certified) operable / folding (CSI Division 10) partitions? As a general observation, I am concerned numerous s
How to define affordable housing : rental and for-sale
ND-Plan-v4 NPDc4:Housing types and affordabilityposted by William Gagnon on
Hello, How do we define principal, taxes and insurance (PITI) in Step 4.' Compute Maximum Pricing'? Should we get in touch with a bank and ask for mortgages rates?
PC 112 Calculating costs
posted by Maki San Miguel Paulson on
The requirement is to use 25% by cost, of the total value of permanently installed products in the project.