100% OA constant volume enthalpy heat recovery ventilator
NC-v4 EQp1:Minimum indoor air quality performanceposted by Noriko Nagazumi on
Hi, Our project is mechanically ventilated by 100% OA constant volume enthalpy heat recovery ventilator.
Non potable water source offsite
NC-2009 WEc1:Water Efficient Landscapingposted by Mario S. on
Our Project is a NC, part of a university campus. The campus is supplying the project with the pipeline for irrigation. all the water supplied by the campus is Non-potable / reused water.
Preferred Parking Spaces Allocation
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Mario S. on
Our project is a new shopping mall that includes retail shops, a supermarket, and restaurants. All parking spaces are located in basement floors (basement 1 to 6).
Addition to Existing Leed EBOM Building
posted by Max Neu on
Forgive me if this has been answered, I searched all over and can't find a definitive answer.
Lighting power allowance calculations for V4 ID+C Retail
Retail-CI-v4 EAp2:Minimum energy performanceposted by Joanna Peacock on
According to ASHRAE 90.1-2010, paragraph 9.6.2, an additional interior lighting power is allowed for the following categories: a) Decorative lighting (up to 1W/ft2) b) Merchandise lighting c) For
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
renovation of multiple non-contiguous parts of an office
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Agnieszka Rylska on
The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.
An example of a ducument for Prerequisite 2
ND-Plan-v4 SLLp2:Imperiled species and ecological communitiesposted by oko Yael on
Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.
Industrial zone
NC-v4 LTc3:High priority siteposted by Charalampos Giannikopoulos on
Would an officially designated industrial zone which provides tax incentives to businesses be considered as an eligible "high-priority site" to locate a project on? Thank you.
preliminary design review - chiller - Baseline
posted by jana Paulech on
Hi, I would like you to ask for helping me with one LEED issue. We were doing energy model and we have received comments to our model, which one of them is this one: 8.