EApc95 - Alternative Energy Performance Metric questions
NC-2009 EAc1:Optimize Energy Performanceposted by Jamy Bacchus on
This pilot credit includes a XL file with tables B through H to calculate savings in terms of GHGs, site energy, source energy, energy cost, peak demand and "if available": TDV and Primary Energy F
CI for Hospital;
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Ajay Kumar on
This project has about 4 public bus stops located within 1/4 mile of walking distance from project entrance.
Air economizer in baseline model
CS-2009 EAc1:Optimize Energy Performanceposted by Jeff Riggs on
If your climate zone does not require air econmizer for baseline systems (90.1 2007, climate zone 4a) are you allowed to model your proposed systems with economizer, per design and not have economi
I believe their is a typo in the reference guide
CI-v4 IPc1:Integrative processposted by Kerry Honsinger on
I believe there is a typo in the ID+C reference guide...My understanding of this credit is that it in no way requires specific site, energy or water improvements, it is just that the possibilities
Stormwater discharged to the Bay
NC-v4 SSc4:Rainwater managementposted by Brightworks Sustainability on
Hi all, I am working on a project located close to the Bay.
HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Vicki Rybl on
The base building for my project is an odd shape and there are a few zones which touch two building walls (for example, a conference room has one window which faces west and three windows which fac
Interior Lighting requirements for plant growth and maintenance
NC-v4 EQc6:Interior lightingposted by Charline SEYTIER on
Hello, We have a project that is considering to install an olive tree in the atrium of the building. To sustain the tree, artificial lighting is required daily, for several hours.
Air economizers in proposed and baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jeff Riggs on
If air economizers are not required to be modeled in the baseline system due to climate zone (4a) can you model the proposed with economizers if in design and not model economizers in the baseline?
v09 Water Use Reduction Additional Guidance available
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by RETIRED on
As part of the October 2016 LEED addenda update (http://www.usgbc.org/articles/leed-addenda-update-october-2016), USGBC updated the Water User Reduction Guidance document to Version 9 (http://www.u
Equipment in Table 3... all or none?
Retail-NC-v4 WEc2:Indoor water use reductionposted by Greg Romanczyk on
Our project serves > 100 meals a day, therefore, Table 3 commercial kitchen equipment applies.