Hi all,
I am working on a project located close to the Bay. Our site will have bioretention ponds, rain gardens, etc., but for the stormwater not infiltrated on site, it will redirect to campus retention and drain directly to the bay. How can we qualify for this credit? Is directing drainage to the bay enough, or does the water have to be treated in some way (similar to SSc6.2 v3 quality control)? Thank you.