Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

n/a

NC-v4 EQc5:Thermal comfort
posted by  Anaïs P  on 

Hello, I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. The building contains new open-office workstations.

1
Wed Oct 26, 2016, 5:13 pm

Requirement 7 - Windows in the Stairs

Pilot-Credits EQpc78:Design for active occupants
posted by  Douglas Flandro  on 

Do the windows in the stairways need to be 8 square feet at each level? I have a 3 story stairwell with a narrow window that runs the length of the stairs. It is 19 feet by 1 foot.

1
Thu Oct 27, 2016, 11:46 am

Tree-Lined Blocks

ND-v4 NPDc14:Tree-lined and shaded streetscapes
posted by  Martine Desbois  on 

Hi Elliot, Do pedestrian only or bicycle paths, being part of the circulation network, be included in the calculation for block length under Tree-Lined Blocks. Thanks

1
Thu Oct 27, 2016, 4:52 pm

Exterior Metal Halides

Healthcare-v4 MRp3:PBT source reduction - mercury
posted by  Dianne Herrin  on 

We are working on a V4 BD+C Healthcare Project, and we're completing the Source Reduction Calculator for the M&R Credit PBT Source Reduction-Mercury.

1
Mon Aug 28, 2017, 10:38 pm

CS v2009 Appendix 4 - Lease and Sales agreement

General forums
posted by  Becky Stumm  on 

I have a project that the owner/landlord are seeking LEED-CS certification, but none of the tenants have any interest in seeking LEED-CI certification.

0

Regularly Occupied Spaces

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Muzammal Abbas LEED AP (BD+C)  on 

I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular

1
Fri Oct 28, 2016, 2:59 pm

historic district

NC-v4 LTc3:High priority site
posted by  sepideh khodadadi  on 

can anyone explain historic district? i don't exactly know what that is

1
Tue Jan 17, 2017, 4:16 pm

Systems Observed In Person

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Devki Wright  on 

Our CxA wasn't able to observe lighting controls in person when he came to commission the other building systems.

1
Thu Oct 27, 2016, 9:48 pm

Previously Developed Buildings exemption

Homes-v4 LTp1:Floodplain avoidance
posted by  Joanne Sawatzky  on 

What is meant by 'previously developed buildings'? We have a project where there are existing residential buildings on a site that will be demolished for new residential buildings.

1
Fri May 5, 2017, 5:25 pm

CI minimum scope of work?

LEED Rating System Selection
posted by  Michael Smithing  on 

Is there a minimum scope of work to certify a project under LEED CI?

1
Sun Jan 15, 2017, 7:19 pm