10% exemption for fire suppression systems
EBOM-2009 EAc5:Enhanced Refrigerant Managementposted by AtSite Inc on
Is is possible to exempt 10% of the floor area that has CFC/halon/etc containing fire suppression systems?
LPD for manufacturing space
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Hi everyone, The project is cosmetic and medicine manufacturing with office. My question is, What difference between detailed manufacturing and Low/High Bay in ASHRAE90.1-2007 table 9.6.1?
Fan power in conditioned space
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Hello, My production line space in our project have an supply fan, exhaust fan and make-up fan to supply OA in conditioned space.
Air Barrier Testing- Commercial
EBOM-v4 EAp2:Minimum energy performanceposted by Justin Tyrrell on
Hi, I work for a company that currently does thermal bypass inspections and air barrier testing on single family and multifamily new construction projects.
100% OA Laboratory System
NC-v4 EAp2:Minimum energy performanceposted by Charles Daze on
I have a HVAC system with labs on it requiring 100% outside air systems. Following all the guidance in 90.1 these spaces require a dedicated Sys 5/7 because they are over 5,000 cfm.
Self adhesive carpet
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Omar Elrawy on
We are using CRI certified carpet that directly adheres to the installed ceramic tiles, so we don't add any adhesives or sealants on-site.
Filtration Change Prior to Flush-out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Marcia Weekes on
On one project, the GC replaced construction filters at AHUs with final filters two months ago. However, delays in TAB and commissioning has delayed the start of the building flush-out.
Tri-gen
NC-v4 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I am QA'ing a model for a building that will be fed via a cogeneration plant (with absorption chillers) and therefore is a little complicated.
DOAS
NC-2009 IEQp1:Minimum IAQ Performanceposted by Kathryn West on
I have project with a dedicated outside air system that introduces air directly to the spaces on all levels (i.e. neutral air). The project has more than 100 VRF units.
Dorm projects
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Brightworks Sustainability on
Hi all, I know this question was answers in various places but for a dormitory that has individual control in units for heat only but not air conditioning (operable windows only), can we still impl