Glass skylights and existing roof

NC-v4 SSc5:Heat island reduction
posted by  Jonathan Hickerson  on 

I have an existing metal standing seam roof that is historic and will remain, and there is a new skylight going in.

1
Tue Aug 30, 2016, 7:32 pm

Faucet Flowrate at Actual Water Supply Pressure

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ran Zhang  on 

Hi all, I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure.

0

Parking and Landscape

NC-2009 PIf2:Project Summary Details
posted by  SAMY Chamy  on 

Dear All:- Our Project is G+5 Factory Building compare to other floors ground floor (floor area) is less in that place we have landscape and Parking so it under the first floor but parking is j

1
Thu Sep 1, 2016, 11:21 pm

Free waste heat

CS-v4 EAp2:Minimum energy performance
posted by  sergio arus  on 

Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.

1
Wed Aug 31, 2016, 3:04 pm

Chilled Water Required for process

NC-2009 EAp2:Minimum Energy Performance
posted by  Dave Hubka  on 

Hi Marcus, Our project is a manufacturing building. The 'widget maker' requires chilled water which is typically provided by the chiller/cooling tower.

1
Tue Aug 30, 2016, 4:37 pm

VOC for fire proofing / intumescent sealants

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Stacey Olson  on 

Would fire proofing / intumescent sealants be considered "Other" or "Architectural Sealants"? I did not find it itemized in SCAQMD 1168. Thank you!

1
Wed Aug 31, 2016, 1:21 pm

Functional Entry for Addition Project

NC-v4 LTc5:Access to quality transit
posted by  Eric White  on 

Our project is a four storey addition to an existing four storey building.

1
Tue Aug 30, 2016, 11:26 pm

What is 'feasible tenant layout'? LEED CS

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Cathy W  on 

I have done a view analyze of all the regularly occupied area of each floor of the project. As it is a glass curtain wall office building, 99% of regularly occupied area have access to views.

1
Wed Aug 31, 2016, 3:02 pm

Ds of VAV

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Cathy W  on 

The Ds is determined by dividing the minimum VAV terminal primary air volume during heating mode by the peak VAV terminal primary air volume during cooling mode. What is a reasonable range of Ds?

1
Wed Aug 31, 2016, 8:08 pm

Minimum HVAC equipment efficiencies

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

The project seeking LEED certification includes air-to-water heat pumps (4-pipe), that are able to produce hot and chilled water (simultaneously or separetly).

1
Wed Aug 31, 2016, 7:28 pm