Glass skylights and existing roof
NC-v4 SSc5:Heat island reductionposted by Jonathan Hickerson on
I have an existing metal standing seam roof that is historic and will remain, and there is a new skylight going in.
Faucet Flowrate at Actual Water Supply Pressure
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Ran Zhang on
Hi all, I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure.
Parking and Landscape
NC-2009 PIf2:Project Summary Detailsposted by SAMY Chamy on
Dear All:- Our Project is G+5 Factory Building compare to other floors ground floor (floor area) is less in that place we have landscape and Parking so it under the first floor but parking is j
Free waste heat
CS-v4 EAp2:Minimum energy performanceposted by sergio arus on
Hi all, We are working in a retrofitting of an existing multi complex building (offices, hotel, retail ) that is planned to be certified as LEED v4 PLATINUM.
Chilled Water Required for process
NC-2009 EAp2:Minimum Energy Performanceposted by Dave Hubka on
Hi Marcus, Our project is a manufacturing building. The 'widget maker' requires chilled water which is typically provided by the chiller/cooling tower.
VOC for fire proofing / intumescent sealants
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Stacey Olson on
Would fire proofing / intumescent sealants be considered "Other" or "Architectural Sealants"? I did not find it itemized in SCAQMD 1168. Thank you!
Functional Entry for Addition Project
NC-v4 LTc5:Access to quality transitposted by Eric White on
Our project is a four storey addition to an existing four storey building.
What is 'feasible tenant layout'? LEED CS
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Cathy W on
I have done a view analyze of all the regularly occupied area of each floor of the project. As it is a glass curtain wall office building, 99% of regularly occupied area have access to views.
Ds of VAV
CS-2009 IEQp1:Minimum IAQ Performanceposted by Cathy W on
The Ds is determined by dividing the minimum VAV terminal primary air volume during heating mode by the peak VAV terminal primary air volume during cooling mode. What is a reasonable range of Ds?
Minimum HVAC equipment efficiencies
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
The project seeking LEED certification includes air-to-water heat pumps (4-pipe), that are able to produce hot and chilled water (simultaneously or separetly).