CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Vicki Rybl on
Hi All, I am working on a project which is a dormitory. Each living unit has a bathroom which, along with a toilet and sink, contains a combination shower/bathtub.
EQc5 & Fume Hoods
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Laura Eubanks on
In order to meet EQc5 requirements, do science prep rooms have to be independently exhausted even if fume hoods are installed (given deck to deck partitions and self-closing doors are present as we
Vertically attached - vertical expansion
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Garrett Ferguson on
I have a 4-5 story non-LEED building that will be adding 4-5 stories to the new project. I'm confused as to why they would require that the addition be of different ownership.
LEED project with associated Parking Deck
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ashley Love on
I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!
IEQp1 online form - potential error
CS-2009 IEQp1:Minimum IAQ Performanceposted by Scott McMillan on
We are at Design Appeal stage on a core and shell office project - we have been asked to recalculate ASHRAE 62 compliance based on a theoretical office floor layout incorporating meeting rooms, cor
Option-3: Irrigation Meter Installed
EBOM-v4 WEc1:Outdoor water use reductionposted by VISHESH AGARWAL on
i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).
Calculator Points clarification
Pilot-Credits MRpc102:Legal Woodposted by Patrice McVeigh on
Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.
How to simulate qualified area for IEQc8.1 at both 9 am and 3pm
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Cathy W on
Our project chose option 1 -simulation. And the simulation result is 84% ROA is qualified at 9 am, 83% ROA is qualified at 3pm. Then I took 83% as a simulation result.
Church+Classrooms = Office?
EBOM-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.