Forum quick links
C&S or NC ?
posted by Claire PIMET on
I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project.
searching out no voc floor sheathing and mdf
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Phil Vanderloo on
I was hoping someone can direct me to a resource, available to Sacramento Ca., for compliant, (no voc or urea formaldehyde), 1 1/8" T&G plywood floor sheathing. Thank You
Trouble finding comparable projects for recycling rates
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Martin Stowell on
I am working on a C&S project and I am trying to figure out the expected volume of recycling for the building.
Water Usage for parks and open spaces
CS-2009 WEp1:Water Use Reductionposted by Deborah Lucking on
Our project is a small pavilion in a park, with tenant space for a food outlet, and (separate) restroom facilities to serve park users.
% of Glazing & Floor Area Base Case vs Project
CS-2009 EAp2:Minimum Energy Performanceposted by Dana Guzman on
Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question.
Future Tenant Ventilation and Parking Garage Exhaust Volume
CS-2009 IEQp1:Minimum IAQ Performanceposted by Shenhao Li on
Dear All, Here I have 2 questions regarding IEQ P1: 1. We have a commercial bulding including a few retail shops. The HVAC systems in these shop will be done by future tenant.
sDA software
NC-v4 EQc7:Daylightposted by Praveenbabu Rajkumar on
Hello everyone, I'm working on the daylight in V4. Is there any free software to do sDA. Please suggest me. Thanks, Praveen
LEED 2009 NC - Warehousemodelling HVAC syetm in IES
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi All, I do need help in the energy modelling for a warehouse project. Thanks in advance! This project consists of 200,000sf of warehouse with 5,000sf office space.
No floor
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by April Ambrose on
A spec-built, cold-dark shell of a building was built with 4 walls and a roof, but the floor is still dirt.
EBOM 2009 IEQ3.2 Alternative Compliance Path
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Kimberly Hosken on
Our project is a five story public building with operational contracts which include "contract document requirements".