Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Auditorium - Core Learning or Ancilliary Learning space?

LEED Rating System Selection
posted by  Maya Karkour  on 

Hello, We have a new building on a K12 school campus. The building includes 1 big auditorium (300 seats) and a gymnasium.

1
Sat Apr 9, 2016, 2:19 pm

SSc5.1 or SSc5.2

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Sheryl Swartzle  on 

My project is a Hotel in urban area with almost a zero lot line. The owner purchased fifteen 25 ft.

1
Wed Apr 6, 2016, 6:57 pm

FSC - outside building envelope

NC-2009 MRc7:Certified Wood
posted by  Bomin Kim  on 

We're shooting for 95% FSC wood in our project and were wondering if permanently installed wood items outside the envelope are included in this number. Thank you

1
Wed Apr 6, 2016, 6:43 pm

Separating waste - reuse at household

CI-2009 MRc2:Construction Waste Management
posted by  Maria Glädt  on 

We have a project where there for example lighting fittings, some doors etc. that would be possible to reuse at other in other buildings.

1
Thu Apr 7, 2016, 7:28 pm

street trees requirement

Pilot-Credits PC14:Walkable Streets
posted by  Angela Wisely  on 

Our project has two street frontages. One we have been able to work with the City to have street trees planted.

1
Mon May 2, 2016, 6:56 pm

Street trees in a winter resort

Pilot-Credits PC14:Walkable Streets
posted by  John Zehren  on 

Our project is bounded by a stream on one side, a road on another and 2 sides are on an active pedestrian mall (non motorized) with retail and restaurants meeting the height to width ratio.

0

Commercial Kitchen

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  José Solis  on 

I have a mixed use office building with the potential for restaurant tenants on the ground floor.

1
Fri Apr 8, 2016, 3:06 pm

existing building modeling

CS-2009 EAp2:Minimum Energy Performance
posted by  Alfonzo Collins  on 

I am modeling an existing building right now. The opaque envelope will be maintained (walls and roof) but the entire inside, all HVAC systems, and windows will be replaced.

1
Sat Apr 9, 2016, 10:18 pm

v2009 Project to comply using Building Automation System?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sara Greenwood  on 

Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m

1
Wed Jan 18, 2017, 1:14 am