DCV requirement for high-occupancy areas

CS-2009 EAp2:Minimum Energy Performance
posted by  Shenhao Li  on 

Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.

1
Tue Apr 5, 2016, 2:48 pm

Tenant Lease Agreement Details

General forums
posted by  Patrice McVeigh  on 

Hi All, I am working on a Core and Shell project, we know who the tenant is and we are looking to draft a legally binding document to ensure that they will install a specific building system. My qu

0

CI - ID Credit for Cooling Tower Collection

CI-2009 IDc1:Innovation in Design
posted by  Rachel Manoguerra  on 

I'm working on a CI project where a 1000 gal storage tank will be set up for the collection of water from the cooling tower. We are not taking credit for it in our WEc1 Waste Water Credit.

1
Tue Apr 5, 2016, 5:56 pm

VRF system

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  GISELA FARHAT DE ARAUJO  on 

We are using the vrf system on a project. Should i put as type of equipment Split AC or should i chose the "others" option?

1
Mon Jun 27, 2016, 6:00 pm

Cold Climate

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Erin Holdenried  on 

Does anybody have experience using an alternate compliance path for a project in a cold climate?

1
Fri Aug 12, 2016, 11:35 pm

No Smoking Signage for a University Dormitory

EBOM-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Patricia Andrasik  on 

Currently we have no smoking signs on the residence hall's main entrances, the ones used by residents to get in and out of the building.

1
Wed Apr 6, 2016, 11:15 pm

FTE and LEED boundary - LEED CI (v4)

Calculating FTEs
posted by  Anna de Anguera  on 

For LEED CI - this may be so obvious and that is why it is not actually stated anywhere - but I'm assuming that FTE's are calculated based on your LEED boundary, and excludes the rest of the buildi

1
Tue Jan 17, 2017, 11:57 pm

LEED Boundary on large site multiple buildings - 1 certifiable

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Alexander Clark  on 

I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site.

0

FTE - Healthcare buildings

Healthcare-v2009 PIf3:Occupant and Usage Data
posted by  VICTOR MORENO  on 

In our Healthcare project, there are workers during the morning, afternoon and evening, with a time of 8 hours each. if I count the FTE, I get a total of workers greater to the number of workstati

0

washer/dryer - what is actual issue, the exhaust or chemicals?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Renee Shirey  on 

We have a project that has a washer & dryer in the corner of a building services room, for periodic/sporadic use.

1
Wed Apr 6, 2016, 3:25 pm