pc14 for Historic School building in urban context
Pilot-Credits PC14:Walkable Streetsposted by Kristian Whitsett on
We were inspired to test out this credit because of the huge increase in students walking to school after we completed a full renovation of a historic school in North Adams, MA.
Reuse roof joists But not roof deck
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by C. Anne Brockelman on
I am working on a renovation project of a courthouse. We will be reusing the roof joists but will remove all the existing roof deck.
Fresh air supply using Cooling pad in Production area
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
Dear all Our project is single storied sewing factory in production area we have large size Exhaust fans in one side and opposite side of exhaust fan have cooling pad Now the issue is we can't p
Renewable Energy Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Our project have boiler (Rice husk fired boiler) we buy the Rice husk from nearest stores for boiler The boiler gives 500 kg/hr steam can we count this boiler energy as renewable energy can w
DHW Equipment Performance; DES Heating
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Dear all, please help me with these questions: 1) I'm not sure how to specify a water heating equipment performance.
Building Flush out for naturally ventilated building
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by PRATIK KUMAR on
Under EBOM IEQ-Cr-1.5, i have a building which is naturally ventilated, i am doing painting for the building, how do i meet the flush out procedure.
Low Emitting Fleet Plan
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Anne Agan on
Hello all - we are pursuing this credit for a school district who has adopted an all-propane bus fleet.
High Process Load and Equipment Efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Shad Traylor on
Our project is a manufacturing plant which is seeking certification under NC Core and Shell v2009.
Building Envelope Commissioning
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by Lance Barron on
We are working with a client who would like to get LEED credit for building envelope commissioning, but which has not pursued enhanced commissioning.
Is it too late to do SSp1?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Indochine Engineering VN on
Hi, My project is a hotel and client just decided to do LEED when Construction of structure is almost done.