LEED Boundary for an Existing Multitenant Building
EBOM-2009 MPR3:Must use a reasonable site boundaryposted by Gabriela Crespo on
Dear All, We are working on a multi-tenant project in Mexico that wishes to pursue LEED O+M Certification, there are two areas on the ground floor with tenants who do not wish to participate in th
Peak discharge/flow rate
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by hana manai on
Which formula do you use to calculate peak flow rate (1 and 2-year, 24hours). I am using NRCS (SCS) TR-55 Graphical Discharge Method. Is that recommanded?
Campus project (Master site) with 4 buildings
NC-2009 EAc2:On-Site Renewable Energyposted by Peg Manuel on
We have a campus project with 4 buildings. The client expects LEED Gold for all 4 buildings. LEED Design Review is complete, LEED Construction review has not begun.
Tenant Installed Equipment and Appliances
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by James Keohane on
I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.
Water-Related Systems Implementation Phase
CS-v4 IPc1:Integrative processposted by Tyler Young on
I love the introduction of this credit. I have a question regarding the implementation phase of the water-related systems.
"Material Value" in LEED credit calculation
posted by Nasim Daryaee on
Hi every one, I have a general question regards definition of " Material Value" .ie, my structure steel value in the manufacture is 200K and the cost I paid to my sub after fabrication ...
100% outdoor air indirec evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Wood stair
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by LEEDme Lorenzi on
Good morning, We have a wood stair (wooden steps covered with another wood species) that is manufactured by the millwork contractor. The scale is a custom made design.
Option 3 Guidance Now Available!
CS-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Paula Melton on
The actual points won't be achievable for a few months, but USGBC has released implmentation guidance. Please see the details here: