Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Boundary for an Existing Multitenant Building

EBOM-2009 MPR3:Must use a reasonable site boundary
posted by  Gabriela Crespo  on 

Dear All, We are working on a multi-tenant project in Mexico that wishes to pursue LEED O+M Certification, there are two areas on the ground floor with tenants who do not wish to participate in th

0

Peak discharge/flow rate

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  hana manai  on 

Which formula do you use to calculate peak flow rate (1 and 2-year, 24hours). I am using NRCS (SCS) TR-55 Graphical Discharge Method. Is that recommanded?

1
Mon Dec 28, 2015, 10:50 pm

Campus project (Master site) with 4 buildings

NC-2009 EAc2:On-Site Renewable Energy
posted by  Peg Manuel  on 

We have a campus project with 4 buildings. The client expects LEED Gold for all 4 buildings. LEED Design Review is complete, LEED Construction review has not begun.

1
Wed Dec 23, 2015, 2:31 pm

Tenant Installed Equipment and Appliances

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  James Keohane  on 

I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.

1
Wed Dec 23, 2015, 5:35 pm

Water-Related Systems Implementation Phase

CS-v4 IPc1:Integrative process
posted by  Tyler Young  on 

I love the introduction of this credit. I have a question regarding the implementation phase of the water-related systems.

1
Mon Dec 28, 2015, 10:34 pm

"Material Value" in LEED credit calculation

General forums
posted by  Nasim Daryaee  on 

Hi every one, I have a general question regards definition of " Material Value" .ie, my structure steel value in the manufacture is 200K and the cost I paid to my sub after fabrication ...

1
Thu Dec 31, 2015, 2:40 am

100% outdoor air indirec evaporative cooling system

NC-2009 EAp2:Minimum Energy Performance
posted by  BEE Incorporations  on 

Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.

1
Mon Dec 28, 2015, 4:08 pm

100% outdoor air indirect evaporative cooling system

NC-2009 EAp2:Minimum Energy Performance
posted by  BEE Incorporations  on 

Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.

1
Mon Dec 28, 2015, 10:13 am

Wood stair

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  LEEDme Lorenzi  on 

Good morning, We have a wood stair (wooden steps covered with another wood species) that is manufactured by the millwork contractor. The scale is a custom made design.

1
Mon Jan 4, 2016, 3:53 pm

Option 3 Guidance Now Available!

CS-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Paula Melton  on 

The actual points won't be achievable for a few months, but USGBC has released implmentation guidance. Please see the details here:

0