Space control requirement sales area

CI-v4 EAp2:Minimum energy performance
posted by  Gabriela Crespo  on 

There is a mandatory requirement to instal a space control that will have at least one control step (between 30 and 70%) for each space.

1
Mon Jul 18, 2016, 6:10 pm

hands soaps sans antimicrobial agents

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Gail Napell  on 

recommended sources for compliant business scale hand soaps? thanks all!

1
Mon Nov 30, 2015, 8:36 pm

Exhaust Requirement

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SAMY Chamy  on 

I think this credit is for fresh air requirement. Is there any requirement for Exhaust rates, are they need to documented for this credit Our project have store rooms as per local Fire and safety

1
Mon Nov 2, 2015, 1:15 pm

Lease Agreement Example

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Heather Holdridge  on 

We have a LEED CS project where some ventilation systems are included in the tenant's scope of work, so I am working the owner to incorporate ASHRAE 62.1 compliance language into the lease agreemen

1
Wed Dec 9, 2015, 4:34 pm

DES Option 1 - Baseline System Heating Type Clarification

NC-2009 EAp2:Minimum Energy Performance
posted by  Mike Ramos  on 

We're using Option 1 of the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and Construction" document to comply with EAp2 / EAc1.

1
Mon Nov 2, 2015, 5:59 pm

Update on USGBC approved multi-attribute certifications?

Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishings
posted by  Landry Watson  on 

Question: Have we any new updates or additional guidance on what certification that Div 9 (finishes) materials should achieve?

1
Wed Jan 13, 2016, 10:34 pm

Commissioning Starting After 50% CDs

NC-2009 EAc3:Enhanced Commissioning
posted by  Sara Zoumbaris  on 

I could have sworn there was an LI (LEED Interpretation) discussing / approving a certain scenario where Enhanced Commissioning had been started after 50% CDs and was still acceptable under this cr

1
Mon Nov 2, 2015, 10:03 pm

mixed use

LEED Rating System Selection
posted by  FABIO VIERO  on 

Hi all, we are working on a refurbishment project located outside US and we are looking for applying LEED v4. The four stories building consist in a mix use as follows: • Museum: more than 75% GFA

1
Fri Nov 27, 2015, 2:22 pm

How do we show for compliance for non-occupiable spaces?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Logan Dorrell  on 

I'm a little confused by what we are supposed to show to document compliance for non-occupiable spaces, like restrooms, that the space matrix call out as "N (VRP) / Y (other req's). We have filled

1
Tue Nov 3, 2015, 5:40 pm

Calculating Ds for cooling condition

NC-2009 IEQp1:Minimum IAQ Performance
posted by  William Beechinor  on 

Hello, I am trying to determine whether or not I am calculating Ds correctly.

0