Forum quick links
Historic district
NC-v4 LTc3:High priority siteposted by Pia Öhrling on
Is option 1 viable if you demolish a non-listed building in a historic district and build a new one in its Place?
3% refueling for future Retail-CI tenant
posted by Katie Peterschmidt on
Our LEED-NC project is required to provide tenant guidelines per CIR 10102.
pressure differential
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Courtney Royal on
How are people proving the differential pressure of applicable spaces in credit documentation?
Male occupant usage w/ family rstrm next to gang rstrms
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Renee Shirey on
Since the default assumption is that 100% of male occupants will use a restroom with a urinal, how do you calculate the usage when there is a family toilet (without a urinal) next to the large gang
Previously Submitted Documentation
CI-2009 PIf5:Previously LEED Certified Detailsposted by CHRISTIAN LUTJEN on
Hello, we are embarking on a new LEED 2009 C.I. project in a building that has already achieved a LEED Gold rating for Core and Shell.
Contacting the USGBC and Combining Tenant Spaces
CI-2009 PIf1:Minimum Program Requirementsposted by CHRISTIAN LUTJEN on
Hello, we have been trying to get an answer from the USGBC for two days short of a full month now.
Minimum Previous Development area/percentage
NC-2009 SSc1:Site Selectionposted by Mario S. on
We are working on a LEED 2009 project that includes multiple adjacent plots that will be combined to form the project site (LEED boundary).
Glazing cover of parking area
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Nina Starynina on
Hi, The project has a covered parking. The Owner is chosing the cover material and considers to implement glazing for the cover (SRI value is 30, SHGC is 50).
LEED Preferred Parking
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Saud Abdul Rasheed on
Hi all, We have received our Final Design Review and the credit has been denied. Now we want to appeal for the credit as the client is willing to provide Low Emitting and Fuel Efficient Vehicles.
How to track benefits of replacing existing conditions
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Lauren Bellamy on
We are working on a project where we will be demolitioning an existing parking lot (asphalt) and existing buildings to build our new project.