Pedestrian walkways outside a kindergarden school
Schools-2009 PIf1:Minimum Program Requirementsposted by Devanand Ragbir on
The project is in Trinidad, Caribbean. There is a plan to construct a kindergarden school in a community which has been in existence for over 60 years.
A single big space which include several functions.
NC-2009 IEQp1:Minimum IAQ Performanceposted by FABIO VIERO on
Hi All, I'm now working on a project under LEED NC certification. The ground floor includes a conference room, offices, technical spaces, meeting rooms, and one big space, in which the following f
ASHRAE Advanced Energy Design Guide - Option 2
NC-v4 EAc2:Optimize energy performanceposted by Aaron Wascher on
Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.
Certify some of multiple fitout floor
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by sompoche sirichote on
Our client will rent 8,10-20 floor within 20 stories building. They would like to get LEED CI certify only for 8 and 10 floor. Can it be done under single project certification?
Pump control using DES v2
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I wonder how would I model the pump control for hot water and chilled water pump if Im using DES v2 option 1.
Fan Power for Proposed model
NC-2009 EAp2:Minimum Energy Performanceposted by Graham Langton on
Outside complying with the fan power limitations - Can the fan power in the proposed model be based on final commissioning data or must it be the design data? Thanks
CSR following UN Global Compact
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Ana García on
Hello! U.N. Global Compact - Communication of Progress is a LEED compliant CSR frameworks.
Location of OA monitor at PAU or AHUs
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Indochine Engineering VN on
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic
Temperature & Ventilation
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Sabrina Cescolini on
Hello everyone, This question references LEED CI Canada version 1.0. The credit language makes it seem like thermal AND ventilation controls must be provided for: - 50% of individual spaces / ope
One single building
NC-2009 PIf1:Minimum Program Requirementsposted by MKK LEED on
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,