Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EBOM SSc2: policy vs practice for snow removal

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Drew DePalma  on 

Hi, I have read in this forum that if no deicer is applied during a performance period that a project would be in compliance with that element of the SSc2 credit requirements.

1
Fri Oct 9, 2015, 10:07 pm

Changes during Design Review

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, We are currently responding to LEED Reviewer comments for a building.

1
Tue Sep 15, 2015, 7:29 pm

Garage Lighting LPDs

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Snider  on 

ASHRAE lists .2 w/sf for garage spaces in Space by Space, and .3 w/sf in Building Area method.

1
Tue Sep 15, 2015, 10:02 pm

What if landscaping isn't installed yet?

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Vanessa Seibert  on 

We are in the PP but do not have our low-water landscaping installed. A contract will be signed to install it prior to the end of the PP. Has anyone obtained the credit this way?

1
Thu Sep 24, 2015, 5:23 pm

Innovation in Design Path 1 & Exemplary Performance Path 2

CS-2009 IDc1:Innovation in Design
posted by  Maggie Hogan Skaug  on 

1) It is my understanding that a project may pursue BOTH Path 1 and Path 2 to attempt up to 5 credits in this category.

1
Wed Sep 16, 2015, 4:32 pm

Option B Calculator

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Haley Duncan  on 

Where can I find the Option B Calculator that is used to calculate compliance with 10 CFM per person for AHU's unable to meet ASHRAE 62.1-2007?

1
Mon Jan 25, 2016, 10:59 pm

School Expansion with Multiple Blocks

LEED Rating System Selection
posted by  Philippa Cameron  on 

Hi, We have a school expansion project to introduce a new middle school on a site which already has an existing primary and secondary school present.

1
Fri Nov 27, 2015, 2:36 pm

Concerning Underground Basements

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Omar Elrawy  on 

Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I

1
Wed Nov 11, 2015, 8:56 pm

Graywater usage

Healthcare-v2009 WEp1:Water use reduction
posted by  Paula Hernandez  on 

Hi, Is it allowed to use treated graywater from lavatories and sinks for urinals and toilettes in Healthcare facilities?, Thank you

1
Thu Sep 17, 2015, 1:27 pm

Dorm Room Controls, no mechanical cooling

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Michele Helou  on 

We have a dormitory project with about 80% individual rooms and 20% double rooms. Each room is provided with a Thermostat and an operable window with over 4% operable window to floor area ratio.

1
Wed Jan 6, 2016, 6:40 pm