Main entrance and LEED Project Boundary for Future Expansion
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Lourdes Salinas on
Hi everyone, we are pursuing the LEED Core & Shell certification for a Campus Project. We received the preliminary design review for the projects inside the LEED Campus Boundary.
Meeting parking requirements for residential spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Magda Aghababyan on
Dear Sir/ Madam, Our project (Hotel) is in a location where there are no defined local zoning requirements for parking.
Appendix A envelope U-values in retrofit projects
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We are doing a project which is being 10% retrofitted. The reviewer wants us to used the envelope values before retrofitting as baseline and the new envelope properties as the proposed project.
Move-in versus construction
posted by Mark Donahue on
Is there a system that can be used for a simple move in (furniture only) for a commercial office space in a non-LEED-certified building?
Water meter broke down during performance period
EBOM-2009 WEc1:Water Performance Measurementposted by Shakir Ismail on
We are working on a project where the building meter is owned by the utility authority.
62MZ calc for critical zones
NC-2009 IEQp1:Minimum IAQ Performanceposted by Indochine Engineering VN on
Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.
HVAC duct insulation adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Gaura Saxena on
Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe
Facility Summary
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Charalampos Giannikopoulos on
LEED Online requests a copy of the complete Statement of Energy Performance (SEP).When generating the statement, it is noted to make sure to select the following report options: Statement of Energy
Roof/Terrace
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Lauren Bellamy on
The project I am working on has a canopy over a terrace, and below the terrace is conditioned space.
District graywater recycling system
NC-2009 WEc3:Water Use Reductionposted by Brian Meinrath on
I am working on a large project that includes over 10 buildings.