Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Main entrance and LEED Project Boundary for Future Expansion

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Lourdes Salinas  on 

Hi everyone, we are pursuing the LEED Core & Shell certification for a Campus Project. We received the preliminary design review for the projects inside the LEED Campus Boundary.

1
Fri Nov 27, 2015, 2:30 pm

Meeting parking requirements for residential spaces

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Magda Aghababyan  on 

Dear Sir/ Madam, Our project (Hotel) is in a location where there are no defined local zoning requirements for parking.

1
Fri Nov 27, 2015, 4:43 am

Appendix A envelope U-values in retrofit projects

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

We are doing a project which is being 10% retrofitted. The reviewer wants us to used the envelope values before retrofitting as baseline and the new envelope properties as the proposed project.

1
Wed Aug 26, 2015, 8:17 pm

Move-in versus construction

LEED Rating System Selection
posted by  Mark Donahue  on 

Is there a system that can be used for a simple move in (furniture only) for a commercial office space in a non-LEED-certified building?

1
Wed Aug 26, 2015, 9:35 pm

Water meter broke down during performance period

EBOM-2009 WEc1:Water Performance Measurement
posted by  Shakir Ismail  on 

We are working on a project where the building meter is owned by the utility authority.

1
Thu Aug 27, 2015, 2:58 am

62MZ calc for critical zones

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Indochine Engineering VN  on 

Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.

0

HVAC duct insulation adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Gaura Saxena  on 

Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe

1
Tue Sep 1, 2015, 12:17 am

Facility Summary

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Charalampos Giannikopoulos  on 

LEED Online requests a copy of the complete Statement of Energy Performance (SEP).When generating the statement, it is noted to make sure to select the following report options: Statement of Energy

1
Thu Aug 27, 2015, 4:04 pm

Roof/Terrace

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Lauren Bellamy  on 

The project I am working on has a canopy over a terrace, and below the terrace is conditioned space.

1
Fri Sep 11, 2015, 6:54 pm

District graywater recycling system

NC-2009 WEc3:Water Use Reduction
posted by  Brian Meinrath  on 

I am working on a large project that includes over 10 buildings.

0