Calculating Gross Floor Area
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Maggie Hogan Skaug on
When calculating GFA, I assume you exclude the levels of the building dedicated to parking?
LEED-EBOM credit as ID credit
NC-2009 IDc1:Innovation in Designposted by Alfonzo Collins on
I was looking through LEED-EBOM and saw IEQc2.1, Occupant Comfort Survey. This seems like a pretty easy credit to achieve.
Spray Foam Insulation
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Claire DeCamp on
I recently had a project manager approach me concerning spray foam insulation that has been specified on a project.
Additions While Project is in Certification Review Process
Schools-2009 PIf2:Project Summary Detailsposted by Robert Fiala on
We have a large school project (340,000 sf) that has been submitted for the design phase review and all design phase points are reviewed and marked as anticipated.
Low impact Eco Resort
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Covello on
Hello, My company is looking to partner with the development of a low impact resort on an island located in Myanmar.
cardboard and paper
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Emmanuel Pauwels on
We are doing a waste audit and we evaluate metals, mixed paper, cardboard, glass, plastics, batteries, and fluorescent lamps.
EA P 2 V4
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Robyn Dowsey on
Has anyone had issues with the energy model not matching the form output I'm looking for an error right now
VRF Systems - Option 1 of EAc1.3
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Roger Carter on
I am looking for some feedback on the interpretation for appropriate zoning and controls. It appears that every solar exposure must have a separate control zone.
Residents and Visitors
NC-2009 WEc3:Water Use Reductionposted by Saju Varghese on
I'm working on a rehab facility that has private toilets for residents (patients) and public toilets and urinals for both visitors and residents (patients).
Differential pressure with large open basment parking garage
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Meghan Ward on
Our LEED project building has a large three floor basement parking (74900 ft2) with small enclosed lobbies (with self-closing doors) connecting occupants to the office floors above.