Forum quick links
Contact at USGBC regarding LEED ND
ND-Plan-v4 MPR3:Must comply with project size requirementsposted by Martine Desbois on
I am looking for a contact at USGBC to discuss our project. Would it be possible to have a contact person name and email or phone number?
Protect Habitat on Campus
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marissa Hebert on
Our project is a large medical campus with multiple buildings on a greenfield site.
How to calculate Floor Area to be Ventilated?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vitor Tosetto on
Dear, I have one more question, please. In ASHRAE 62.1-2010 section 6.4.1 there is an explantion about floor area to be ventilated.
IAQ calculator occupancy designations?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Patricia Andrasik on
I'm working on a dormitory that features 4-bedroom suites that are occupied by 5 people (3 single rooms and one double per suite as well as a living room, shower room, sink/vanity area, and toilet)
Home size credit calculation
Homes-v4 EAp4:Home sizeposted by Jean Henderson on
Developing 130 unit condo project. 24 are 2 bdr (average size 36% below ES ref home). Rest are 1bdr (average size 24% below ES ref home).
Submission of Design Cr. during Constr. Final Rev. f. 2nd round
posted by Lise Dannesboe on
Hi! Split-Review project: We submitted a Design credit for Design Prelim Review and for the Final Design Review, I would like to put this credit on hold and first submit for a second round of revie
Space usage type - kitchen
CS-2009 PIf3:Occupant and Usage Dataposted by Thomas Baltsersen on
We got a comment back from preliminery review regarding kitchen in an office building. We defined these Spaces as retail general which apparently was incorrect.
Meter for Water Use in Laundry
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Jon Penndorf on
Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks
Construction - Indoor Air Quality V2009
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Noelle Hunner on
Does the indoor air quality credit allow for propane powered lifts (inside the building) during construction? Or do they have to be battery powered only?
v4 Project on 2009 Campus
posted by Edwin van Eeckhoven on
Dear all, I am working on a LEED CS 2009 project on a 2009 Master site. Our ambition is that the next up coming project is to be a v4 project.