Medical records room with 7 cubicles.
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
I was wondering in order to comply with this credit, will we have to provide thermal controllability for 50% of the 7 cubicles or can we just consider it a multi-occupant space?
Credit documentation
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Charalampos Giannikopoulos on
For credit compliance using Option 3 - Approach 1 is any documentation other than the “EBOM SSc4 Alternative Transportation Survey Results Calculator” required? In addition, the "Sample SSc4 Survey
Workspace Pods
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Akos Brandecker on
Many of our clients are installing 'workspace pods' in their offices to encourage flexible working. These pods come in many shapes and sizes for individual/ group working, meeting spaces.
Performance Period
EBOM-v4 WEp2:Building-level water meteringposted by Matthew Hanks on
I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?
Doubt
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Hugo Pereira on
Hello there. My team and I are certifying a building in Brazilia, Brazil.
indoor smoking room exhaust
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Nicole Isk on
Hi, an occupant in our project building (office) insists on indoor smoking. He agreed to installing a cabin in his kitchenette (they already smoke there).
Retail (other than mall) or Enclosed Mall
Retail-CI-v2009 EAc5:On-site renewable energyposted by Geraldine Assmus on
I'm certifying a project which is located within a mall, it has access from the street and from inside the mall.
Treatment of shared chiller plant
posted by Scott McMillan on
We have a central chiller plant generating chilled water to serve a hotel and a convention centre. Only the convention centre will be seeking LEED certification under LEED NC 2009.
Submission through design review
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Charalampos Giannikopoulos on
Does the tenant design & construction guidelines (which is considered as a design credit) need to be finalized for review submission?
Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.