Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Natural Stone : Floor Score compliance required or not for ?

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Ammar Yahia  on 

We have a situation here, for the scope of finishes company's materials submittals. the query wither the compliance with Floor score or any stringent third party is applicable or not for Natural St

1
Fri May 22, 2015, 12:38 pm

Can we administer survey on multiple days?

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Helen Samuel  on 

I have a project that has operations 7 days a week. About 75% of workers come to the site Mon-Thu, and the other 25% of the workers come to the site Fri, Sat and Sun.

1
Thu Mar 10, 2016, 12:50 am

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Mon Jun 1, 2015, 9:00 pm

Where do I upload the response report for Design Final Package ?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

1
Mon Jun 1, 2015, 9:05 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Fri May 22, 2015, 1:33 pm

Where do I upload the response report for Design Final Package ?

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

1
Fri May 22, 2015, 1:34 pm

Stormwater not going to municipal infrastructure

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Michael Wahjudi  on 

We have site that is located about 600m from the sea, hence the stormwater will be discharged to the sea instead going to municipal infrastructure.

1
Fri May 22, 2015, 9:51 am

Exemplary performance

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  LEEDme Lorenzi  on 

Our project is a renovation located near a metro station and near four bus stop.

1
Wed Aug 12, 2015, 7:42 am

registering a project

NC-2009 MPR4:Must comply with minimum floor area requirements
posted by  Megan Bove  on 

Good morning. I am trying to register a project that is 7,893.3 square feet.

1
Fri Nov 27, 2015, 3:33 am

Casework - Combination of New and Salvaged/Repurposed Material

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Russell Philstrom  on 

I am working on a project that has the client moving into a new building from their existing space.

1
Mon Jun 1, 2015, 8:53 pm