Forum quick links
Task Lights in Scope
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jonathan Weiss on
Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.
Certifying a single Building within a Complex - energy metering
EBOM-2009 EAc1:Optimize Energy Performanceposted by Peter Gibney on
I have a query with respect to our Building and an aceptable level of energy metering. The building under certification is one of several buildings however has common heating and cooling production
Policy Template - Maintenance Equipment "goals"
EBOM-v4 SSp1:Site management policyposted by Maureen Colburn on
In the Site Mgt Policy template for this prerequisite under the "goals" section for maintenance equipment, 3 options to select from are listed (limit grass, use only manual or electric equipment,
MR - Ongoing Purchasing and Waste Policy - Food waste (compost)
posted by Julien Lafond on
The summary of changes document linked above notes that this MR - Ongoing Purchasing and Waste Policy prerequisite now requires the tracking of food waste/compost, however this isn't noted in the o
Campus road
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Susan Di Giulio on
We have a project on a university campus. The university maintains the roads on the campus, although there is public access 24/7.
School staff spaces closer to entrance than LE/FEV spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by C Michael Ross on
Our project is a high school building with parking separated into different areas for visitors, staff, and students.
Acoustic Test in the Field
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Holly Van Straten on
I am a manufacturer of HVAC equipment that is installed in a classroom. Due to this prerequisite I get frequently asked if we "meet LEED standards".
Appeal to one credit related to other
posted by jorge calderon on
Hi, I have one more question. What happen if I will appeal SSc6.2 (documentating it for the first time) but changing SSc6.1 (awarded) because a new strategy included in SS6.2?
appeal process
posted by Courtney Royal on
after you submit an appeal (pretty straightforward, just making further claifications), will the GBCI review just make one more review or say we missed something again, will we get comments back?
EAP2 case 1 for international projects
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Elodie DUMAS on
I have a question about the following statement from above : "We have an international project and the space type is eligible for an Energy Star rating.