Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Is APPENDIX Needed

NC-2009 IEQp1:Minimum IAQ Performance
posted by  ABDUL MUTHALIB MOHAMED  on 

In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we need to fi

0

If Purchasing Chilled Water from Campus Central Plant...

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Nelina Loiselle  on 

We have a project that we are modeling as purchased chilled water and steam because it is on a campus that includes a central plant. The campus sells the utilities to the department.

1
Wed Feb 18, 2015, 7:12 pm

ID credits for Homes

LEED for Homes (LEED-H) Forum
posted by  Keelan Kaiser  on 

Hi, are there ID credits available in Homes for Green Power and Green Cleaning that someone could point me to?

1
Thu Mar 24, 2016, 10:45 pm

Documentation for Plan

ND-Plan-v4 GIBp1:Certified green building
posted by  David West  on 

For certification of at the plan stage I assume that GBCI doesn't expect a building to be constructed and certified.

1
Sat May 9, 2015, 7:09 pm

Datacentre Requirements

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Priyadarsi Das  on 

Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.

1
Wed Feb 11, 2015, 11:34 pm

Sound Transmission - achievable?

NC-v4 EQc9:Acoustic performance
posted by  Tim Habraken  on 

For a project, we are dealing with the following situtation: we have small meeting rooms, situated (as "boxes") in an open-office plan.

1
Wed Feb 4, 2015, 7:59 pm

Monitoring Period

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Mari Hamasaki  on 

What is the required monitoring period for this credit?

0

What is the difference

NC-2009 IEQp1:Minimum IAQ Performance
posted by  John Pugh  on 

What is the difference between breathing zone outdoor airflow and room outdoor airflow rate? How do I find the room outdoor airflow rate for bedroom/living room type spaces Thanks.

0

Reduction of impervious area

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Danielle Spicer  on 

I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e

1
Thu Feb 5, 2015, 3:46 pm

audit of land-fill materials only?

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Jutta Berns  on 

our hotel project already has in place a rigorous waste diversion programme, where 80%+ is diverted from landfill.

1
Thu Feb 5, 2015, 4:56 pm