Is APPENDIX Needed
NC-2009 IEQp1:Minimum IAQ Performanceposted by ABDUL MUTHALIB MOHAMED on
In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we need to fi
If Purchasing Chilled Water from Campus Central Plant...
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Nelina Loiselle on
We have a project that we are modeling as purchased chilled water and steam because it is on a campus that includes a central plant. The campus sells the utilities to the department.
ID credits for Homes
posted by Keelan Kaiser on
Hi, are there ID credits available in Homes for Green Power and Green Cleaning that someone could point me to?
Documentation for Plan
ND-Plan-v4 GIBp1:Certified green buildingposted by David West on
For certification of at the plan stage I assume that GBCI doesn't expect a building to be constructed and certified.
Datacentre Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.
Sound Transmission - achievable?
NC-v4 EQc9:Acoustic performanceposted by Tim Habraken on
For a project, we are dealing with the following situtation: we have small meeting rooms, situated (as "boxes") in an open-office plan.
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?
What is the difference
NC-2009 IEQp1:Minimum IAQ Performanceposted by John Pugh on
What is the difference between breathing zone outdoor airflow and room outdoor airflow rate? How do I find the room outdoor airflow rate for bedroom/living room type spaces Thanks.
Reduction of impervious area
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Danielle Spicer on
I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e
audit of land-fill materials only?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Jutta Berns on
our hotel project already has in place a rigorous waste diversion programme, where 80%+ is diverted from landfill.