INSTALLATION NEW ROOF
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Andres Giraldo on
Is installation of a new roof to replace the old roof on the project building not considered an alteration or addition per credit MRc3?
Medical Equipment Efficiency Comparison
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by Ivan Romero on
Have just started exploring this credit I'm hitting the same headwinds reported by folks attempting the EA pc 3 credit from earlier years.
International Project Epa CGP
NC-2009 SSp1:Construction Activity Pollution Preventionposted by ESRA OZKONUKSEVER on
Hi Y'all, we re working on a project in Turkey and creating an ESC and a SWPPP plan.
Ventilation design-worst case conditions
CI-2009 IEQp1:Minimum IAQ Performanceposted by S Nagarajan on
How to provide a narrative to explain how the worst-case condition was determined considering the total design airflow rate at the condition analyzed
PC 29 Index
Pilot-Credits PC29:Housing and Jobs Proximityposted by Gary Hansen on
We registered for this credit back in 2011 and we are finally completing the project. I think I just need to participate here and complete the online survey.
LED podium box for advertisement
CS-2009 EAp2:Minimum Energy Performanceposted by Katrina Chong on
Does anyone know whether LED monitors for advertisement are considered as exterior lighting? Does it need to comply with the 2.2W/m2 Exterior LPD requirement as stipulated in ASHRAE 90.1?
Site Management Policy
posted by Kelsey Jensen on
When compiling the list of requirements for this policy I was wondering if there is a specific goal that must be met to be considered "low emissions" for maintenance equipment?
SS7.2 Design review comment
Schools-2009 SSc7.2:Heat Island Effect—Roofposted by Michael Stills on
I received a reviewer comment requesting documentation to confirm which (standing seam metal roof) color was installed to verify the associated SRI values. Installed?
Acceptable thermal conditions in naturally conditioned spaces
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Panupant Phapant on
There is a cafeteria where the HVAC designer of record intends to have it naturally conditioned.
Campus Project
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by P Fanfulik on
I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?