Forum quick links
The vent calcs indicate a total area significantly lessthan Plf2
NC-2009 IEQp1:Minimum IAQ Performanceposted by Matt Dem on
Hi, I received a comment for (Design Preliminary Submission) ventilation calculations indicate a total area (3,055 sqf) significantly less than plf2 (6219 sqf) for the IEQp1 Our response is; The ar
Off site signage for Low-Emitting- Hybrid parking spaces
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Vada Kornegay on
If I have no parking spaces in my LEED boundary, is it ok to have my Low-Emitting parking adjacent to the site? forgive me if this has been answered/asked by someone else.
NC v2.2 Optional Misc. Documents on Project Summary DocumentsTab
posted by Heidi Sentivan on
Hello, We are getting ready to submit our combined NCv2.2 submission.
Office building with dining facility
NC-2009 IEQp1:Minimum IAQ Performanceposted by CT G on
We are working on the design of an office building where there is a conditioned dining area for office workers and visitors. The dining facility has the capacity to accommodate 280 people.
Private vs. Public
NC-v4 WEp2:Indoor water use reductionposted by Lorne Mlotek on
why do a private lavoratory faucet have a higher rate than a public under the EPAct 2.2 vs 0.5?
ANY PRESENTATIONS DONE FOR NEW LEED FOR HOSPITALITY?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by robert feduik on
I'm asked to give a talk on LEED for Hospitality...was wondering if there are any good PPT presentations that might be available?
Solid Surfacing Materials in LEED v4
NC-v4 EQc2:Low emitting materialsposted by Amit Ahiel on
Are solid surfacing materials considered in this credit under furniture?
CWM - Temporary Landfill
NC-2009 MRc2:Construction Waste Managementposted by ethen mcmanus on
The entire purpose of MR2 is to divert waste from landfills, and the waste should be either recycled, donated, salvaged or reused. My question is as follows: My project is in a third world countr
EAp2 Domestic Hot Water Pump sizing
NC-2009 EAp2:Minimum Energy Performanceposted by MKK LEED on
Hello, Appendix G Table G.3.1 - Service Hot water systems states "The service hot-water system in the baseline building design shall use the same energy source as the corresponding system in
Existing building, physically sepatated from new construction
NC-2009 PIf2:Project Summary Detailsposted by FABIO VIERO on
We are working on a new constuction in Italy under LEED Certification (NC 2009). An existing building, physically sepatated from the new construction, is located inside the LEED Boundary.