Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ID credit in a hospital?

Schools-2009 IEQc10:Mold Prevention
posted by  Payette Library  on 

We're thinking about going for this credit for a Hospital project (NC v2.2), since code requires all hospitals to have strict mold prevention measures.

1
Fri Nov 14, 2014, 7:19 pm

Parking Roof

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Noriko Nagazumi  on 

Are we supposed to include parking roofs on SSc7.2 heat island - roof's calculations? I assume that all roofs should be included.

1
Fri Sep 11, 2015, 7:30 pm

Dricon: Fire-Retardant Treatment

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Kai Starn  on 

Hello all, I came across a fire treatment product (Dricon: Fire-Retardant Treatment).

1
Sat Nov 15, 2014, 2:02 am

Theater lighting

NC-2009 EAc1:Optimize Energy Performance
posted by  Keelan Kaiser  on 

I've gone through the threads and can't find a response for a question like this, there must be one, but we have a theater project with all of the speciality lighting associated with this use.

1
Fri Nov 14, 2014, 4:34 pm

IEQ c4.3 Flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Rezkar Abdulmajeed  on 

We have a project with some floor areas designed to be ceramic and quarry tiles. Can someone advise if the two above need to meet floorscore standrads. your comments are appreciated

1
Thu Feb 12, 2015, 2:06 pm

Efficiency First

EBOM-v4 WEc1:Outdoor water use reduction
posted by  LEED Pro Consultant  on 

Does the 30% reduction need to be accomplished through landscape efficiency first and then add up alternative water sources, or may this be accomplished through any landscape irrigation means (alte

1
Fri Nov 21, 2014, 2:52 pm

Incineration

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Emmanuel Pauwels  on 

Is is correct that incineration does not qualify as waste diversion?

1
Sat Nov 15, 2014, 6:18 pm

COMMISSIONING

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Yaser Al Sharif  on 

WE ARE WORKING ON LEED CERTIFICATE FOR CI BUILDING (14000 SQUARE FOOT) THE POINT IS, WE HAD RENTED OFFICE AND THE HVAC SYSTEM WERE INSTALLED SINCE FIVE YEARS AGO, NEWLY WE INSTALLED NEW HVAC EQUIPM

1
Fri Jan 1, 2016, 7:30 pm
1
Tue Feb 17, 2015, 1:45 pm

Alternative HVAC duct sealant

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  John Covello  on 

Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.

1
Wed Nov 19, 2014, 6:19 pm