Tenant work and submittal of credits
CS-2009 IEQp1:Minimum IAQ Performanceposted by Lise Dannesboe on
I am currently working on a Core & Shell project, which is a major renovation, aiming at LEED SILVER.
Minimum and average negative pressure measurements
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Bilge Ceylan on
In our project, the design pressure is well above the minimum required negative pressure in our smoking rooms with respect to the adjacent areas.
Zinc Spray
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Andreas Soederberg on
I am looking for a product to replace zinc anti corrosive aerosols. I have two questions: 1. Did I understand the LEED criteria correctly?
Regularly Occupied Space
NC-2009 PIf3:Occupant and Usage Dataposted by Keelan Kaiser on
Would theater/performance dressing rooms and special dedicated "star" dressing rooms be considered regularly occupied spaces with regard to IEQc8.1 and 2?
Rolling Shades
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ema S on
Are rolling shades mandatory when doing the prescriptive method?
LEED EBOM
posted by Srimannarayana NCVK on
Hi, We are working on a project in Dubai. The building is 55% office and 45% hotel.
loading bay inside building footprint
NC-2009 PIf2:Project Summary Detailsposted by Melissa Merryweather on
Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.
LEED Construction Submission
posted by Christopher Strunk on
Had a question from a client on when we can submit the LEED-NC 2009 Construction Submission. Can the submission be made prior to all commissioning being completed and documented?
daylight sensing
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I wonder whether daylight sensing (lights are dimmed automatically according to daylight) can increase the points a project can obtain in this credit. Table G36.2 doesn’t mention such a system.
Data Center in Portfolio Manager
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Charalampos Giannikopoulos on
How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.