Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tenant work and submittal of credits

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Lise Dannesboe  on 

I am currently working on a Core & Shell project, which is a major renovation, aiming at LEED SILVER.

0

Minimum and average negative pressure measurements

CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Bilge Ceylan  on 

In our project, the design pressure is well above the minimum required negative pressure in our smoking rooms with respect to the adjacent areas.

0

Zinc Spray

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Andreas Soederberg  on 

I am looking for a product to replace zinc anti corrosive aerosols. I have two questions: 1. Did I understand the LEED criteria correctly?

1
Sat Nov 15, 2014, 3:12 am

Regularly Occupied Space

NC-2009 PIf3:Occupant and Usage Data
posted by  Keelan Kaiser  on 

Would theater/performance dressing rooms and special dedicated "star" dressing rooms be considered regularly occupied spaces with regard to IEQc8.1 and 2?

0

Rolling Shades

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ema S  on 

Are rolling shades mandatory when doing the prescriptive method?

1
Thu Nov 13, 2014, 2:49 pm

LEED EBOM

LEED Rating System Selection
posted by  Srimannarayana NCVK  on 

Hi, We are working on a project in Dubai. The building is 55% office and 45% hotel.

1
Sun Dec 7, 2014, 10:37 pm

loading bay inside building footprint

NC-2009 PIf2:Project Summary Details
posted by  Melissa Merryweather  on 

Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.

0

LEED Construction Submission

General forums
posted by  Christopher Strunk  on 

Had a question from a client on when we can submit the LEED-NC 2009 Construction Submission. Can the submission be made prior to all commissioning being completed and documented?

1
Thu Nov 13, 2014, 4:09 pm

daylight sensing

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

I wonder whether daylight sensing (lights are dimmed automatically according to daylight) can increase the points a project can obtain in this credit. Table G36.2 doesn’t mention such a system.

1
Thu Nov 13, 2014, 3:52 pm

Data Center in Portfolio Manager

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Charalampos Giannikopoulos  on 

How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.

1
Tue Jan 17, 2017, 9:45 pm