Recycled cork can contribute to achieve MRc6?
NC-2009 MRc6:Rapidly Renewable Materialsposted by Ricardo Sá on
We're working in a project that use a thermal coating based on cork material. This cork is 100% recycled. Can this material contribute to achieve both credits (MRc4 +MRc6)?
Confusion over tile
Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Crista Shopis on
Above in the "Birds Eye View" tab, it says "Resilient flooring, rubber flooring, ceramic tile, and prefinished wood flooring all must be FloorScore or Greenguard Children and Schools certified." Bu
How many people per control
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Matthew Catterall on
In the checklist above under 'How many people per control?' it states that a single mechanical system control can serve up to two occupants... So, if one thermostat is provided in a room that thre
Addition To An Existing Certified Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Timothy VanOudenhoven on
I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building. There w
Multiple Points for One RPC
NC-2009 RPc1:Regional Priorityposted by Suzanne Johnson on
Water efficient landscaping is listed as an RPC in the database for a project. It states "WEc1 I Up to 4 Points".
Active controls and thermal control
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Matthew Catterall on
We have a project with both perimeter and interior offices.
DCV vs IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi everyone! I have a project that the system works with outside air demand according to the CO2 sensor.
calculation of material cost
NC-2009 MRc5:Regional Materialsposted by Doreen Kruschina on
Hi, in every LEED Project we do struggle in obtaining the material costs as many companies refuse to split their invoices in those for material and those for labour. Question is whether the assumpt
Regularly Occupied Spaces
NC-2009 PIf3:Occupant and Usage Dataposted by Lauren Bellamy on
Hi, I am working on a project under LEED BD+C that has some shell space that will no be outfitted until well after the completion of the construction and LEED documentation.
Long Term Service Contract
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Erin Holdenried on
Does anybody have an example of a long term service contract, or know specifically what needs to be included in the contract in order for it to be accepted by the GBCI reviewer?