Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Study Guides and Practice Exams for LEED v4

General forums
posted by  Cindy Davis  on 

I have learned from MADCAD that LEED Study Guides will not be published by USGBC.

0

Measurement doubt

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Andres Giraldo  on 

We have large area of natural landscape with vegetative and adapted vegetation in certain percent of it.

1
Thu Dec 11, 2014, 5:36 pm

LEED Boundary & Covered Parking (Vegetated Roof)

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Rashida Mogri  on 

We designed a building/garage right up against an existing building/garage.

1
Tue Sep 16, 2014, 3:33 pm

Anticipated Tenant Fit Out

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Paula Hernandez  on 

Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo

0

Sound Transmission

NC-v4 EQc9:Acoustic performance
posted by  Mark Zoeteman  on 

Sound transmission requirements for adjacency combinations are listed in Reference Manual Table 1.

1
Fri Apr 15, 2016, 6:58 pm

M&V Plan Doubt

NC-2009 EAc5:Measurement and Verification
posted by  Marina Andrade  on 

Hi everyone, i'm studying the protocol of measurement & verification, and checked out some necessary points which must be in the plan but did not quite understand.

1
Thu Aug 28, 2014, 2:28 pm

Exterior lighting artwork - Process Load

NC-2009 EAc1:Optimize Energy Performance
posted by  Victoria Watson  on 

Hi, I am working on a project where they are proposing a lighting installation forming a piece of artwork. They are asking whether it can be excluded from the LEED calcs.

1
Thu Aug 28, 2014, 3:59 pm

reused water for cooling towers and process saving

NC-2009 WEc3:Water Use Reduction
posted by  Renaud Gay  on 

Hello We work on an pharma project and we want to resuse MAU condensate, on-site treated waste water and rain water to supply toilets, irrigation and Cooling towers.

0

Qualification for Credit

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Wendy Lao  on 

My site has no stormwater management facilities. It is surrounded by natural vegetation/open space, and parts of the land has hills.

1
Thu Dec 11, 2014, 6:17 pm

Which speicalty I should choose (BD+C or ID + C)?

General forums
posted by  Eric Lee  on 

Hi Tristan, I am a lighting designer that responsible both for the exterior and interior lighting of different kind of project such as government urban area or luxury retails, I have just passed t

0