Parking for LEFE car in the basement

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Indochine Engineering VN  on 

Hi all, I have a project with 4 basements serving as underground parkings. I have a question: will LEFE car parking always locate in the basement 1 near the entrance?

1
Mon Aug 25, 2014, 1:56 pm

Recirculated Air

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Emmanuel Pauwels  on 

We are working on a small building that will operates for conferences and private events. There will be a kitchenette or coffee point (only microwave, coffe maker and refrigerator).

0

Regional Material in Non LEED building

NC-2009 MRc5:Regional Materials
posted by  jack larson  on 

Within my LEED boundary are two buildings, One is a LEED building, the other is not ....

1
Mon Aug 25, 2014, 6:07 pm

Commissioning Agent or Authority-Difference & Does Size Matter?

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Michelle Bracewell-Musson  on 

Hello, I have researched, and for some reason have missed the boat when it comes to the difference between a Commissioning Agent and Authority and when (which prerequisites and credits) you must u

1
Mon Aug 25, 2014, 2:11 pm

Tenant retail areas, non-regularly occupied Space?

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  TOMAS URIBE  on 

Hello there! Based on the Reference Guide Correction ID#100001102 made on 11/01/2011: "Non-regularly occupied spaces are spaces that occupants pass through, or spaces used in pursuit of focused a

1
Mon Aug 25, 2014, 5:50 pm

ETo units and ETo calculation software

NC-2009 WEc1:Water Efficient Landscaping
posted by  Renaud Gay  on 

Hi all, I'd like to ask again the same question that in LEED form ETo is expressed in inch/month for July. This is not super clear but looks like this.

0

Independence of CxA - enhanced commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Qian Tang  on 

Hello experts, i'm not sure about the independence of the CxA at enhanced commissioning for a projekt lager than 50,000 ft2. Is the CxA allowed to be a member of a subsidiary firm of the builder-o

1
Tue Aug 26, 2014, 10:35 pm

Motor Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Dear All, For modelling pumps for my Proposed design, I have a manufacturer's datasheet for a Variable speed pump (Secondary pump) with the following values: Duty Flow = 209.5 gpm Du

1
Tue Aug 26, 2014, 1:34 pm

LEED NC Credit EAc2 for LEED ID+C project as an ID credit

CI-2009 IDc1:Innovation in Design
posted by  Amit Ahiel  on 

I have researched this and see that we can earn credit for a Thermo Solar Water system on a LEED ID+C project. The question is, will we only earn 1 point or the full set of points per the NC system

0

LEED Dynamic Plaque--any thoughts and experiences to share?

LEED Rating System Selection
posted by  ACE Bermuda  on 

Hi all, I'm curious to know if anyone has had experiences with installing and maintaining the Dynamic Plaque. Empirical opinions on the ease, or difficulty, of use would be appreciated.

1
Tue Sep 2, 2014, 3:53 pm