Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

local installation in DC

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Kristopher Croghan  on 

I have a few open offices where multiple occupants work in the same space, our workstation panels are just above the 42" height so we won't be able to qualify as 100% in these areas.

1
Mon Aug 18, 2014, 6:10 pm

ID Credit for SMaRT Level 3 Products?

CI-2009 IDc1:Innovation in Design
posted by  Brian Salazar  on 

Hello! I have used Cradle-2-Cradle Certification (C2C) in the past as a methodology for achieving an Innovation credit. In these cases, 2.5% of material costs fell under the C2C umbrella.

0

Worst condition?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Noriko Nagazumi  on 

From the requirements: "Verify performance of the smoking rooms’ differential air pressures by conducting 15 minutes of measurement, with a minimum of 1 measurement every 10 seconds, of the differe

1
Tue Feb 24, 2015, 10:28 pm

Material documentation

NC-2009 MRc4:Recycled Content
posted by  Nouran Abdel-Rahman  on 

We receive letters from suppliers and manufacturers documenting the recycled content of the materials, but not declaring the cost per item.

1
Tue Aug 19, 2014, 11:29 am

Campus-Same master site- LEED NC v4 and LEED EBOM 2009

LEED Guidance for Campuses and Multiple Buildings
posted by  FRAGKISKOS LEVANTIS  on 

In a commercial campus 3 individual projects are pursuing certification under LEED EBOM 2009.

1
Tue Aug 19, 2014, 2:55 pm

Please update checklist above

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Lyle Axelarris  on 

The "Document credit compliance on LEED Online" portion of the checklist provided above needs to be corrected to avoid further confusion. 1.

0

FTE calculation for a Dorm

NC-2009 PIf3:Occupant and Usage Data
posted by  Nelina Loiselle  on 

How would we calculate FTE for a dormitory that all full and part-time employees are residents within the building.

0

fire supression gas FM200

CS-2009 EAc4:Enhanced Refrigerant Management
posted by  Regina Gul  on 

Is gas FM200 allowed for fire supression systems?

1
Wed Aug 20, 2014, 9:04 pm

Problems Downloading Project Reports

Living with LEED Online - quirks, bugs and hiccups
posted by  Charles Nepps  on 

Does anyone else out there have problems downloading Reviewer's project reports from LEED Online(V3)?

1
Wed Aug 20, 2014, 2:53 pm

Showers/Changing rooms at another level.

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Devanand Ragbir  on 

Our bicycle racks are next to an elevator which travels up 80ft to a gym which has the required no. changing/shower rooms. The gym is accessible to all the building occupants.

1
Wed Aug 20, 2014, 11:48 am