IAQ Flush out-using temporary exhaust systems
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Stella Stella on
Hi, We are proposing a IAQ flush out procedure for our facility which consist of a lot of FCU’s. Due to the FCU’s the flush out procedure is excessively long.
LEED Project Boundary - Football Stadium
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa VandeVoort on
Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?
energy costs
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Sometimes in the energy bills a part of the costs doesn't depend on the energy that is used (e.g.
LEED Spec-construction credits' responsibility on GC/CM
posted by Jody Boelhauf on
Has anyone had any luck on writing their LEED Specification in which the general contractor or construction manager is actually responsible for filling out the LEED Online credits? Our office uses
No VOC information
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Citlali Mora Bello on
Hello, We are working on a project that is trying to achieve this credit, but I've encountered two problems: 1. Some of the cut sheets do not specify the VOC test methodology. 2.
Lighting Power Density
NC-2009 EAp2:Minimum Energy Performanceposted by Bernie Hont on
I am modeling a shell office building project for LEED 2009 using ASHRAE 90.1-2007 as the basis for modeling.
Do three multifamily buildings qualify as multiple buildings?
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We have a project with three multifamily apartment buildings and each qualifies under the new-ish LEED for Homes Multifamily 2010 rating system.
Required Vegetated Area and LEED Boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by CT G on
Hello, We have a project with the following site constraints: The LEED Project Boundary includes 2 new buildings: an office tower, and a small bank building.
Commercial Kitchen
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Nate Gillette on
Would one consider items purchased for a commercial kitchen (i.e., new glasses, plates, creamers, etc) a durable good? It seems like the only place to put it. Thoughts?
government administrative center.
NC-2009 SSc2:Development Density and Community Connectivityposted by patricia vasconcellos on
My project is a government building, which is being built in an exclusively governmental area. only government buildings are constructed in this area. is a government administrative center.